Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 01-0B0904

Submit new inquiry for this project


Inquiry #1: Why are there no bid items for Rain Event Action Plan, Storm Water Sampling & Analysis Day, Water Quality Sampling & Analysis Day, and Water Quality Monitoring Report?
Inquiry submitted 01/31/2020

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 01/31/2020


Response #2:
The Hunter/Panther project is regulated through the U.S. EPA Construction General Permit.

The North Coast RWQCB, and SWRCB, do not have regulatory authority over implementing NPDES storm water requirements on the project since the project is located on the Yurok reservation.

The items listed below are requirements of the California Construction General Permit.
1) Rain Even Action Plan
2) Storm Water Sampling and Analysis day
3) Water Quality Sampling and Analysis day

Since the RWQCB and SWRCB do not have jurisdiction, these items are not required.

The following item is already included in the project plans and estimate
1) Water Quality Monitoring Report (see item 131104)

Response posted 02/06/2020




Inquiry #2: Addendum 1, revised Special Provision Section 55-2.01D(2)(c) states the hanger assembly manufacturer must have successfully installed similar hanger assemblies on at least 5 bridges. As the hanger assembly manufacturer does not install the hanger assemblies, we assume this requirement applies to the structural steel erector. Please confirm.
Inquiry submitted 02/17/2020

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 02/18/2020


Response #2:
Your inquiry is being reviewed. Unless an addendum is issued addressing your concern, please bid per the contract bid documents.
Response posted 02/21/2020


Response #3:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Friday, March 20, 2020. Please bid per the current contract documents.
Response posted 03/23/2020




Inquiry #3: Please provide the mandatory pre-bid meeting agenda and/or describe the planned topics for discussion.
Inquiry submitted 02/18/2020

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 02/18/2020


Response #2:
The agenda for the Mandatory Pre-bid Meeting will be provided at the meeting.
Response posted 02/26/2020




Inquiry #4: Does this project require both a an EPA SWPPP and Caltrans SWPPP? It is not clear.
Also, does Section 13-1.01D(4)(c) #8 apply, if this project is under the EPA CGP?

Inquiry submitted 02/18/2020

Response #1:
(#4)-Your inquiry has been received and is being reviewed.
Response posted 02/19/2020


Response #2:
Please refer to Standard Special Provision, Section 13.

The entire Section 13-1.01D(4)(c) is applicable to this project.
Response posted 02/21/2020




Inquiry #5: Is there a copy of the sign in sheet from the mandatory prebid meeting?
Inquiry submitted 03/12/2020

Response #1:
(#5)-Your inquiry has been received and is being reviewed.
Response posted 03/12/2020


Response #2:
The sign-in sheet has been posted, please see this link and click EA 01-0B0904 Pre-bid Meeting Sign In Sheet.

https://dot.ca.gov/caltrans-near-me/district-1/d1-projects/d1-hunter-panther-bridge-replacement
Response posted 03/23/2020




Inquiry #6: Please provide a copy of the mandatory pre-bid meeting sign in sheet(s).
Inquiry submitted 03/12/2020

Response #1:
(#6)-Your inquiry has been received and is being reviewed.
Response posted 03/16/2020


Response #2:
The sign-in sheet has been posted, please see this link and click EA 01-0B0904 Pre-bid Meeting Sign In Sheet.

https://dot.ca.gov/caltrans-near-me/district-1/d1-projects/d1-hunter-panther-bridge-replacement
Response posted 03/23/2020




Inquiry #7: Can you please send a copy of the attendance list for the mandatory prebid meeting that took place?
Inquiry submitted 03/16/2020

Response #1:
(#7)-Your inquiry has been received and is being reviewed.
Response posted 03/16/2020


Response #2:
The sign-in sheet has been posted, please see this link and click EA 01-0B0904 Pre-bid Meeting Sign In Sheet.

https://dot.ca.gov/caltrans-near-me/district-1/d1-projects/d1-hunter-panther-bridge-replacement
Response posted 03/23/2020




Inquiry #8: Ref. Sheet 60 of 122; Which bid item includes the pipe pin jackets?
Inquiry submitted 03/16/2020

Response #1:
(#8)-Your inquiry has been received and is being reviewed.
Response posted 03/16/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Friday, March 20, 2020. Please bid per the current contract documents.
Response posted 03/23/2020




Inquiry #9: Bid Item 115 “Structural Steel (Pipe Pin)” quantity is 3,041 LB. The 9” XXS pipe pins only weigh 1,937 Lbs. Please advise.
Inquiry submitted 03/16/2020

Response #1:
(#9)-Your inquiry has been received and is being reviewed.
Response posted 03/16/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Friday, March 20, 2020. Please bid per the current contract documents.
Response posted 03/23/2020




Inquiry #10: Given the recent Coronavirus restrictions across the County's, State, and Nation, there is extreme uncertainty on the future restrictions. Subs and suppliers may not be able to hold prices as restrictions extend unknowingly into the future, Contractors are forced to bid and schedule the award/ntp/contract work without accurately knowing when these will occur, and quarantines will limit the government employees and contractor's employees from building and managing the work, these bridges cant be constructed from the home office. We request Caltrans to suspend or postpone the bid until the future certainty is known.
Inquiry submitted 03/18/2020

Response #1:(#10)-Your inquiry has been received and is being reviewed.
Response posted 03/18/2020


Response #2:
At this time the Department is not postponing contracts due to the Covid-19 virus. Due to the fluid and dynamic nature of the situation, the Department will evaluate the postponement of bid openings on a weekly basis.
Response posted 03/23/2020




Inquiry #11: Plan sheet number 97 of 122 labeled HUNTER CREEK BRIDGE (REPLACE) DECK CONTOURS shows the quantities in the bottom right. The structural concrete , bridge (Polymer Fiber) quantity appears to be inflated with no apparent 4.0 KSI CISS concrete pile quantity.

Is it your intent to use the polymer fiber concrete in the CISS pile as indicated by the quantity?

Inquiry submitted 03/18/2020

Response #1:
(#11)-Your inquiry has been received and is being reviewed.
Response posted 03/18/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Friday, March 20, 2020. Please bid per the current contract documents.
Response posted 03/23/2020




Inquiry #12: Special Provisions page 34 section 14 states: "Remove vegetation between September 16 and February 28." Does this mean the project Access Roads, Clearing and Grubbing, foundation construction, road detours etc.. and all work that touches vegetation cannot begin until September 16?
Inquiry submitted 03/18/2020

Response #1:
(#12)-Your inquiry has been received and is being reviewed.
Response posted 03/18/2020


Response #2:
Please refer to Section 14-6.03B and Section 14-6.06. Please bid per the contract bid documents.
Response posted 03/23/2020




Inquiry #13: Will this be postponed?
Inquiry submitted 03/19/2020

Response #1:
(#13)-Your inquiry has been received and is being reviewed.
Response posted 03/19/2020


Response #2:
At this time the Department is not postponing contracts due to the Covid-19 virus. Due to the fluid and dynamic nature of the situation, the Department will evaluate the postponement of bid openings on a weekly basis.
Response posted 03/23/2020




Inquiry #14: Are you postponing this project's bid date?
Inquiry submitted 03/19/2020

Response #1:
(#14)-Your inquiry has been received and is being reviewed.
Response posted 03/19/2020


Response #2:
At this time the Department is not postponing contracts due to the Covid-19 virus. Due to the fluid and dynamic nature of the situation, the Department will evaluate the postponement of bid openings on a weekly basis.
Response posted 03/23/2020




Inquiry #15: Is bidding and working on the project "Essential" and will the bid and project proceed considering the latest California shutdown?
Inquiry submitted 03/20/2020

Response #1:
Under the Governor's Shelter in Place order, transportation sector is considered essential and not subject to the shelter in place order. The Department will continue to advertise and bid open construction projects during the COVID-19 emergency.

Response posted 03/24/2020




Inquiry #16: We are having a difficult time finding the pipe pin material, the 9 XX-Strong. Has Caltrans considered any alternatives to this size pipe that could be used? Trying to avoid a mill rolling, which will substantially increase the cost to the project.
Inquiry submitted 03/25/2020

Response #1:
(#16)- Please bid per current contract documents.
Response posted 03/25/2020




Inquiry #17: Ref. Sheet 60 of 122; The 9” XX-strong pipe for the pipe pins is not available. Please advise.
Inquiry submitted 03/25/2020

Response #1:
(#17)-Please bid per current contract documents.
Response posted 03/25/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.