Inquiry #1: Did not see RSP B11-84 and RSP B11-85 included in the plan set.
Inquiry submitted 09/17/2021

Response #1:(BI#1)-All the details required to build the concrete barrier type 85 (mod), bicycle railing and the architectural treatment are included in the Structures plan set (sheets 18-21).
There should be no need to include the 3 unmodified sheets (xs16-117-1, xs16-117-2,xs16-117-3). The first 2 sheets were modified and included in the plan set (sheets 18 and 19), and the third sheet was replaced with sheet 21 for the tubular bicycle railing. Sheet 20 is for the architectural treatment of the barrier.


Response posted 09/17/2021




Inquiry #2: What is the application rate for the Organic Fertilizer listed in the Erosion Control Legend (ECL-1) under the Erosion Control Type 1 table (sheet 40 of 122)? 5-3-2 is a fertilizer formulation.
Inquiry submitted 09/27/2021

Response #1:(BI#2)-Your attention is directed to the Contract Special Provision 20-1.01D(3) Soil Testing. The application rate shall be as recommended by the soils test a described in Special Provision 20-1.01D(3). The N-P-K values shown on ECL-1 will be superseded by the recommended design modifications per the soils test.

Response posted 09/27/2021




Inquiry #3: Are there any project specific environmental permits?
Inquiry submitted 10/01/2021

Response #1:(BI#3)-All relevant environmental permits are included in the contract documents.

Response posted 10/01/2021




Inquiry #4: Why are there two sets of cross sections? They seem to be the same.
Inquiry submitted 10/07/2021

Response #1:(BI#4)-Please refer to Addenda# 2 posted on October 18, 2021.

Response posted 10/07/2021




Inquiry #5: Along the shear pile wall location in drawing L-2 it shows drilling through the existing EPS block system. It is also shown again on sheet 85 and appears to be well away from the new wall alignment. Will there be drilling through the foam block system?
Inquiry submitted 10/12/2021

Response #1:(BI#5)-Yes, Caltrans is aware that drilling will be done through the EPS Block system. Yes, there will be drilling through the foam (EPS) blocks. Geotech and Structural are fine with this and aware of the issue. Bid as per current contract documents.

Response posted 10/12/2021




Inquiry #6: I don't see the quantities or scope for the Concrete Stain work. Can you direct me?
Inquiry submitted 10/15/2021

Response #1:(BI#6)-Please see the Structures Plans, Rodeo Creek Landslide No. 2 General Plan (Sheet 95/122) for quantities and Specification Section 78.

Response posted 10/15/2021




Inquiry #7: Chart No. K1 indicates the maximum length of closure when using signal system is 1500 LF. Stage 1 and 2 closures shown on stage drawings are longer that 1500 LF. Please clarify.
Inquiry submitted 10/15/2021

Response #1:(BI#7)-The distance from Limit Line to Limit Line of the signalized traffic control is approximately 1700 ft. as shown on the plans. Please bid as per current contract documents.
Response posted 10/15/2021


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.