Inquiry #1: Don't see a mobilization item, where do you want to put our fixed costs?
Inquiry submitted 10/04/2018

Response #1:
(#1)-There is no bid item for mobilization. Please refer to section 99-1 General Requirements, Part 1 -General, 1.7 Schedule of Values, item F which indicates to distribute overhead and profit proportionally across all line cost items.
Response posted 10/05/2018




Inquiry #2: Hello,

In regards to the 10/9/2018 Abbendum to the drawings,

I went through the link that was provided and just wanted to confirm that the Electrical Control Enclosures have not been changed?

It looks like the Addendum covered other items throughout the job package. We are bidding on the Electrical Control Panels/Enclosures that contain the XiO controllers. Any help is greatly appreciated.

Respectfully,

Anthony Ellis
714-322-8484

Inquiry submitted 10/10/2018

Response #1:
(#2)-Addendum Number 1 does not make any changes to the Electrical Control Enclosures.
Response posted 10/10/2018




Inquiry #3: What is the packaged treatment manufacturer used for the basis of design for this project?
Inquiry submitted 10/11/2018

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 10/11/2018


Response #2:
Please bid per the current contract bid documents.
Response posted 10/15/2018




Inquiry #4: Is it possible to access inside the Comfort Station utility room for study. The same request would be asked of the Electrical Room at the north end of the tunnel. Are there any photos that could be shared?
Inquiry submitted 10/18/2018

Response #1:
(#4)-Access and photos will not be available. Please bid per the current contract bid documents.
Response posted 10/19/2018




Inquiry #5: In order to pull new wire through the existing conduit in the tunnel ; access to the area in the plenum chamber would seem necessary. What is the extent of pull boxes throughout this area? Is the drawing on sheet EE-10 a true depiction of the conduit location in the plenum soffit area? Is it a confined space? What is the air quality and is it a concern? Will this work affect traffic in the tunnel?
Inquiry submitted 10/18/2018

Response #1:
(#5)-Your inquiry has been received and is being reviewed.
Response posted 10/22/2018


Response #2:
Please refer to as-builts which are available per Special Provisions section 2-1.06B. Plan sheet EE-10 shows a true depiction of the conduit location. The plenum is a confined spaced as defined by Cal/OSHA. Please refer to Standard Specifications section 7-1.02K(6)(c) Tunnel Safety and section 7-1.02K(6)(d) Confined Space Safety for work in the tunnel and plenum.
Response posted 10/24/2018




Inquiry #6: Hello,

Does the Addendum No.2 that was issued today make any changes to the Electrical Control Enclosures??

Inquiry submitted 10/19/2018

Response #1:
(#6)-Addendum No. 2 does not make any changes to the Electrical Control Enclosures.
Response posted 10/22/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.