Inquiry #1: Is a DVBE material supplier dollar amount allocatation towards dvbe goal 60% or 100%? For example: DVBE material cost quoted $100.00. Does $100.00 go toward the goal or $60.00?
Inquiry submitted 09/17/2020

Response #1:
(BI#1)-Your inquiry has been received and is being reviewed.

Response posted 09/18/2020


Response #2:
(BI#1)-Your attention is directed to Section 2-1.12B of the Standard Specifications. Please bid per the contract documents.
Response posted 09/22/2020




Inquiry #2: 1) The quantity stated for Location 21- Ditch Excavation on Sheet Q-1 appears much greater than shown on the plan and profile Sheet (DS-21). Can you please verify the 80cy quantity for this location?

2) Where can we find what concrete surfaces are to be Prepared and Sealed for Item 75?

Inquiry submitted 10/05/2020

Response #1:
(BI#2)-Your inquiry has been received and is being reviewed.

Response posted 10/05/2020


Response #2:(BI#2)-An addenda #1 was issued on 10/8/2020. Also, please refer to the permits in the Information Handout for the following description of work: The project includes work at ephemeral and intermittent streams. No perennial streams would be affected by this work. See SSP 13-12.01C(1) Temporary Creek Diversion System Plan for one location where cast in place concrete surfaces may be exposed to flowing stream or creek water as described in the SSP 78-4.09 Cure Concrete. Item 2.20 of the California Department of Fish and Wildlife PLAC contains construction requirements for water that comes into contact with uncured concrete. After curing cast in place concrete surfaces, as described in SSP 78-4.09, water may come into contact with the concrete.
Response posted 10/08/2020




Inquiry #3: On sheet Q-1 it appears that the available embankment is generated by the ditch excavation. If the ditch excavation quantity is reduced, will the import barrow quantity be increased?
Inquiry submitted 10/05/2020

Response #1:
(BI#3)-Your inquiry has been received and is being reviewed.

Response posted 10/05/2020


Response #2:
(BI#3)-Please bid per the contract documents.
Response posted 10/08/2020




Inquiry #4: Where can we find the specifications or requirements for Item 65- Culvert Contact Grouting? The Standard Specification reserves the section, and we can't find where the special provisions address it.
Inquiry submitted 10/12/2020

Response #1:
(BI#4)-Your inquiry has been received. However, please be aware due to the short time frame between when this inquiry was received and the bid opening, there may not be time to provide a response. If no additional response is posted please bid per the current contract documents.

Response posted 10/13/2020


Response #2:
(BI#4)-Please refer to the Special Provisions Division VII section 71. Existing Drainage provided in the bid package.
Response posted 10/13/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.