Inquiry #1: We noticed on the plan drawings on pd-2 that there is shown parking bumpers although no items to bid on these. Thank You.
Inquiry submitted 11/29/2022

Response #1:(BI#1)-Your inquiry has been received and is being reviewed.

Response posted 11/29/2022


Response #2:(BI#1)-See Section 99-1.1B of the Special Provisions and sheet GP-3. Bid per current contract documents.
Response posted 12/06/2022




Inquiry #2: 1) Confirm Door #3 (Type A -Interior) is indeed Bullet Resistant. All other door type A are exterior openings.

2) Hardware Groups #6 & #8 -Operating trim is not needed when lockset / latch is used. Confirm that the push & pull plates can be removed from groups.

3) Openings #18 & #21 -Rapid Roll-Up Doors -Confirm a hollow metal frame (pmf) is required at these openings. It will be provided by 99-08100 -Steel Doors And Frames (Per Detail 1/A1-17).

4) Openings #25 -Overhead Coiling Door -Confirm a hollow metal frame (pmf) is required at this opening. It will be provided by 99-08100 -Steel Doors And Frames (Per Detail 1/A1-17).

Inquiry submitted 01/03/2023

Response #1:(BI#2)-Your inquiry has been received and is being reviewed.
Response posted 01/03/2023


Response #2:Structure’s response:
1.Please see the door schedule on A0-7. Yes door no. 3 is bullet resistant. Please bid per the current contract documents.
2.Yes, door hardware groups no. 6 and no. 8 have cylindrical locksets. Please bid per the current contract documents.
3.For openings no. 18 and no. 21, please see details 1 and 4 on A1-17 for the PMF. Please see section 99-08100 for the requirements of the frames.Please bid per the current contract documents.
4.For opening no. 25, please see details 1 and 7 on A1-17 for the PMF. Please see section 99-08100 for the requirements of the frame. Please bid per the current contract documents.

Response posted 01/06/2023




Inquiry #3: Please confirm that there is NO DVBE goal or requirement for this project.
Inquiry submitted 01/06/2023

Response #1:(BI#3)-Your inquiry has been received and is being reviewed.
Response posted 01/06/2023


Response #2:(BI#3)-Attention is directed to the NOTICE TO BIDDERS. Bid per current contract documents.
Response posted 01/06/2023




Inquiry #4: Specification Section 99-15330B Materials specifies an "end suction" fire pump. The pump drawn on related plan page M2.01 illustrates what is commonly known as a "Horizontal split case" fire pump. An end suction pump can not be driven by an engine as shown. Please clarify.

Plan page M2.01 Equipment Schedule calls for a pump to deliver 1,750 GPM @ 70 PSI.
NFPA does not have a 1750 GPM as a rated flow for fire pumps, we can quote a pump that will deliver 1750 GPM but the rated flow will be 1500 GPM. Is this acceptable.


Inquiry submitted 01/10/2023

Response #1:(BI#4)-Your inquiry has been received and is being reviewed.
Response posted 01/10/2023


Response #2:(BI#4)-
Structure’s response:
1.Fire pump to meet requirements of plan sheet M2-01 and NFPA 20.
2.A 1500 GPM pump is not acceptable. Please provide a pump that is capable of delivering the required 1750 GPM as approved by the State Fire Marshal.

Response posted 01/12/2023




Inquiry #5: Looking for clarification: Bid Item # 50 as well as a few locations on the drawings call out for Fiber Rolls, however on sheet ECL-1 there is mention of Compost Sock.
Inquiry submitted 01/10/2023

Response #1:(BI#5)-Your inquiry has been received and is being reviewed.
Response posted 01/11/2023


Response #2:(BI#5)-Bid per current contract documents.
Response posted 01/13/2023




Inquiry #6: Section 99-09953 FRP panels

On plan sheet A0-6 the finish schedule remarks for the FRP states wainscot.

On plan sheet A1-7 the elevations show FRP unclear as to what height.

Inquiry submitted 01/11/2023

Response #1:(BI#6)-Your inquiry has been received and is being reviewed.
Response posted 01/11/2023


Response #2:(BI#6)-Structure’s Response: Finish descriptions under Walls in the finish schedule on plan sheet A0-6 reference a general height of 8’ for the FRPP. For the Scale Room (Room 100), sheet A1-7 shows the FRPP varies in relation to the ceiling heights as called out in the Remarks on the finish schedule on sheet A0-6. In addition, plan sheet A1-11 shows a section of FRPP at the emergency eyewash/shower in the Truck Inspection Bay.
Response posted 01/12/2023




Inquiry #7: The project has bid item # 109 for traffic signal poles. There are not any plan pages that show traffic signal poles on the project. Can you please confirm what this bid item is for.
Inquiry submitted 01/11/2023

Response #1:(BI#7)-Your inquiry has been received and is being reviewed.
Response posted 01/11/2023


Response #2:(BI#7)-Attention is directed to Sheet SQ-1.
Response posted 01/13/2023




Inquiry #8: The Electrical quantities pages shows type 30 poles being required yet the plan pages E-5 and E-6 only show type 32 poles. Can you please clarify what is required.
Inquiry submitted 01/11/2023

Response #1:(BI#8)-Your inquiry has been received and is being reviewed.
Response posted 01/11/2023


Response #2:(BI#8)-Attention is directed to section 5-1.02 of the Standard Specifications. Bid per current contract documents.
Response posted 01/13/2023




Inquiry #9: Item 0038 Edging -is there a more detail picture of the weathering steel stake ( A606-4)
because I need to have this planter boxes built and stakes also

Inquiry submitted 01/11/2023

Response #1:(BI#9)-Your inquiry has been received and is being reviewed.
Response posted 01/11/2023


Response #2:(BI#9)-Bid per current contract documents.
Response posted 01/13/2023




Inquiry #10: Please provide appropriate scale for sheets EE2-1 and EE2-3.
Inquiry submitted 01/11/2023

Response #1:(BI#10)-Your inquiry has been received and is being reviewed.
Response posted 01/11/2023


Response #2:(BI#10)-Structure’s Response: Sheet EE2-1 has no scale. Please refer to sheet A2-1 which has a scale. There is no sheet EE2-3.
Response posted 01/12/2023




Inquiry #11: EE2-1 & EE2-2
Having scaled the building on the A sheets. The building does not work out. Please verify the building size and scale

Inquiry submitted 01/17/2023

Response #1:(BI#11)-Your inquiry has been received and is being reviewed.
Response posted 01/17/2023


Response #2:(BI#11)-Structure’s Response: Building size to be per Architectural sheets.
Response posted 01/18/2023




Inquiry #12: The generator specs state that it is for non-emergency use. PG&E power is available and being tied in. Please clarify what the generator's primary use is and will it be for standby power only
Inquiry submitted 01/18/2023

Response #1:(BI#12)-Your inquiry has been received and is being reviewed.
Response posted 01/18/2023


Response #2:(BI#12)-The generator will be for standby power use if the facility loses power due to any electrical service issue.
Response posted 01/19/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.