Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 02-4G5604

Submit new inquiry for this project


Inquiry #1: The CIPP lining specification section 71-3.08B(1) says that at location 14, the minimum wall thickness for the CIPP is 2 inches or the minimum thickness shown in the authorized installation plan, whichever is greater. This will require the CIPP installed in the 54" diameter pipe to be, at a minimum, over 50mm thick, which is too thick for this diameter of CIPP and will not be possible to install. We will be unable to quote the CIPP lining on this project if this minimum thickness requirement is not removed from the specifications or reduced to something more feasible like 0.7 inches.
Inquiry submitted 01/20/2020

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 01/21/2020


Response #2:
(#1)-An addendum will be issued to address this bidder inquiry.
Response posted 01/31/2020




Inquiry #2: CMP Pipe backfill,
If 2 sack popcorn cement backfill is used in in/lieu of native back fill, is 12” clearance on the sides of the pipe, to trench wall acceptable? Or does it have to have 24” on each side to trench wall?

Inquiry submitted 01/27/2020

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 01/27/2020


Response #2:
Your attention is directed to Standard Specifications Section 19-3.03I. Please bid per current contract documents.
Response posted 01/28/2020




Inquiry #3: Will the ASHTOO M326 product be allowed as an alternate to the CIPP product to bid item 47 and 48?

47 710392 42" CURED-IN-PLACE PIPELINER LF 74
48 710396 54" CURED-IN-PLACE PIPELINER LF 200

Inquiry submitted 01/27/2020

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 01/28/2020


Response #2:
(#3)-Please bid per current contract documents.
Response posted 01/31/2020




Inquiry #4: Will the ASHTOO M326 product be allowed as an alternate to the welded steel pipe product to bid item 54?

54 039122 36" TRENCHLESS WELDED STEEL PIPE CULVERT (0.625" THICK) LF 330

Inquiry submitted 01/27/2020

Response #1:
(#4)-Your inquiry has been received and is being reviewed.
Response posted 01/28/2020


Response #2:
(#4)-Please bid per current contract documents.
Response posted 01/31/2020




Inquiry #5: Will the ASHTOO M326 product be given a consideration as a possible solution to the bid item 47,48 and 54 after bid? What is the reason if not? Thank you.
Inquiry submitted 01/31/2020

Response #1:
(#5)-Your inquiry has been received and is being reviewed.
Response posted 01/31/2020


Response #2:
Please bid per current contract documents.
Response posted 02/07/2020




Inquiry #6: Can Metal Flared End Sections be used for Alternate Flared End Sections for RCP as shown on Standard Plan D94A or must the Alternate Flared End Section for RCP be of the same material?
Inquiry submitted 02/04/2020

Response #1:
(#6)-Your inquiry has been received and is being reviewed.
Response posted 02/04/2020


Response #2:
Your attention is directed to Standard Specifications Section 70-1.01. Please bid per current contract documents.
Response posted 02/07/2020




Inquiry #7: Addenda #1 was sent out on 2/5/2020, but when you click the link and go to the download there is no file to download. Please reattach the file so we can review it.
Inquiry submitted 02/06/2020

Response #1:
(#7)-Addendum #1 files are online and available to download on both bidx.com and Caltrans site.

Response posted 02/06/2020




Inquiry #8: Addendum 1 has changed the Risk Level from 2 to 1 and made it a SWPPP project with REAPs and Stormwater Sampling & Analysis Days. Risk Level 1 projects do not require REAPs or Stormwater S&A Days.
Also, the Water Quality Sampling and Analysis Days do not have the typically associated items Water Quality Sampling Report and Water Quality Annual Report. Is that intentional?

Inquiry submitted 02/06/2020

Response #1:
(#8)-Your inquiry has been received and is being reviewed.
Response posted 02/06/2020


Response #2:
Please bid per current contract documents.
Response posted 02/07/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.