Inquiry #1: 1) Where can we find the construction details for Bid Item 34- Exclusion Fencing?

2) The Revised Standard Specification for Section 12-1.04- Payment is not used. Are we correct in understanding that the Department will not be paying 1/2 of the cost for furnishing flaggers?

3) If the contractor fails to complete the project within the number of working days bid, will the stated cost of time at $4,800 per day be assessed for the period in excess of the working days bid required to finish the project?

Inquiry submitted 02/28/2020

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 03/02/2020


Response #2:
1) Please refer to Special Provision - Section 14.

2) Yes, based on the Revised Standard Specification for Section 12-1.04, the Department will not be participating in the cost of furnishing flaggers.

3) Please refer to Standard Specifications Section 8-1.10.
Response posted 03/04/2020




Inquiry #2: Section 15-1.03C lists the stockpile location as the Sunrise Electric Maintenance Shop in Rancho Cordova. Is the the salvaged guardrail to be delivered to this location as well?
Inquiry submitted 03/04/2020

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 03/05/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Thursday, March 12, 2020. Please bid per the current contract documents.
Response posted 03/17/2020




Inquiry #3: Item 34 EXCLUSION FENCING

SOQ identifies 1,750 LF. There is no SP or RSS for section 16, nor is there a Construction Detail.
Where does it go and what is required?
Thanks

Inquiry submitted 03/09/2020

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 03/10/2020


Response #2:
Your attention is directed to the Layout Sheets and Special Provisions Section 14 in regards to the Exclusion Fencing. Section 16 in the Standard Specifications provides specifications for constructing temporary high-visibility fences.
Response posted 03/10/2020




Inquiry #4: On the Fiber Optic Cable Systems plan sheets note 1 is utilized and states to leave 65' of slack 144 SMFO cable coiled in vault. If you go to plan sheet 83 EQ-1, the fiber optic cable system quantities as it relates to vaults indicates that the department wants splice enclosures in all but two of the new vaults. So my question, is the extra 65' of slack expected to be racked inside the new vaults on new racking ? Are we to provide and install new splice enclosures and terminate each end of the new 144 SMFO inside the new splice enclosures ?
Inquiry submitted 03/10/2020

Response #1:
(#4)-Your inquiry has been received and is being reviewed.
Response posted 03/10/2020


Response #2:
1. Yes, please bid per current contract documents.

2. Yes, please bid per current contract documents.

Response posted 03/12/2020




Inquiry #5: Shown on plan sheet EQ-1, under the FOCS chart it shows on E-10 a qty of 2-#6TE pull boxes. Sheet E-10 has no #6TE pull boxes shown ??
Inquiry submitted 03/10/2020

Response #1:
(#5)-Your inquiry has been received and is being reviewed.
Response posted 03/10/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Thursday, March 12, 2020. Please bid per the current contract documents.
Response posted 03/17/2020




Inquiry #6: Shown on plan sheet Q-1, Pavement, Structure Quantities Summary, HMA (Type A) quantity does not appear to match the calculated quantity based on the depicted structural sections on sheets L-1 to L-10. Please verify the quantity of HMA on plan sheet Q-1, Pavement, Structure Quantities Summary, HMA (Type A) correctly accounts for the Engineer’s intended structural section.
Inquiry submitted 03/11/2020

Response #1:
(#6)-Your inquiry has been received and is being reviewed.
Response posted 03/11/2020


Response #2:
Please bid per the current contract documents.
Response posted 03/17/2020




Inquiry #7: There is no Item for Bonded Fiber Matrix ( 12437 SQFT)
Inquiry submitted 03/11/2020

Response #1:
(#7)-Your inquiry has been received and is being reviewed.
Response posted 03/11/2020


Response #2:
Your attention is directed to Item 40 in the Bid Item List rounded to 12,500 SQFT.

Please bid per the current contract documents.

Response posted 03/12/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.