Submit new inquiry for this projectInquiry #1: Could Caltrans please provide PPF files so that a proper smoothness analysis can be done prior to bidding?
Inquiry submitted 11/27/2018
Response #1:(#1)-Your inquiry has been received and is being reviewed.
Response posted 11/27/2018
Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Tuesday, December 4, 2018.
Please bid per the current contract documents.
Response posted 12/04/2018
Inquiry #2: The plans show no details for cold planning and RHMA-O paving at the on and off ramps. Please provide transition details and quantities associated with the ramps.
Inquiry submitted 11/27/2018
Response #1:(#2)-Your inquiry has been received and is being reviewed.
Response posted 11/27/2018
Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Tuesday, December 4, 2018.
Please bid per the current contract documents.
Response posted 12/04/2018
Inquiry #3: 1:Based on CalTran's standard specifications a 144"x90" C47C(CA) sign is to be mounted on Laminated Wood Box Posts. 2015 CalTrans standard specifications section 82-3.02D states that these are a department furnished item. Where will the contractor be able to pick up the Laminated Wood Box Posts from and will the contractor be required to return the Laminated Wood Box Posts upon removal?
2:Will the C47C(CA) signs be required to be "NEW" signs upon installation on this project or will used signs in acceptable condition be accepted for use? If used signs in acceptable condition can be used what is the determining factor for "ACCEPTABLE CONDITION"?
Inquiry submitted 11/28/2018
Response #1:(#3)-Your inquiry has been received and is being reviewed.
Response posted 11/29/2018
Response #2:
1. An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Tuesday, December 4, 2018.
Please bid per the current contract documents.
2. Used signs are acceptable as long as they meet the requirements for acceptable conditions specified in section 12 of the Standard Specifications and conform with the specifications for Project Funding Identification signs.
Response posted 12/04/2018
Inquiry #4: Will Caltrans consider allowing additional time to pave back the RHMA-O after cold milling and crack fill operations? The current specification requires a same day pave back. This is not only highly unproductive but can create issues in regards to smoothness.
Inquiry submitted 11/29/2018
Response #1:(#4)-Your inquiry has been received and is being reviewed.
Response posted 11/29/2018
Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Tuesday, December 4, 2018.
Please bid per the current contract documents.
Response posted 12/04/2018
Inquiry #5: Please verify that the bid item quantities for the following bid items are accurate;
10. Shoulder Backing
16. Rubberized Hot Mix Asphalt-Open Graded
19. Tack Coat
37. Asphaltic Emulsion (Fog Seal Coat).
Inquiry submitted 12/06/2018
Response #1:
(#5)-Please bid per the current contract documents.
Response posted 12/07/2018
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.