Inquiry #1: For Bid Item # 14 Contrast Stripe Paint the plans do not state if we are to use Option 1, Option 2, or both on the various striping details listed in the quantity chart. For the 8" gore stripe and channelizing lines which are solid stripes it is obvious that we will use Option 1 but for the Detail 37, 9A, and 12A skip patterns either option is available. Please clarify.
Inquiry submitted 02/15/2019

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 02/15/2019


Response #2:
Please refer to note 2 on PDQ-1, "Place option 1 contrast striping on PCC pavement."

Response posted 02/19/2019




Inquiry #2: Per plan sheet X-1, this shows striping only on mainline only, however, plan sheet PDQ-1 shows quite a bit of detail 25A, 36, 36A and Detail 9A for removal and installation, which would indicate that work is to be performed on the on and off ramps as well. Is the intent to replace striping on mainline and all ramps? If so, where will the work terminate for the on and off ramps? Down to the end of the ramps at the stop bar, or down to the end of the gore? Please clarify work limits.
Inquiry submitted 02/17/2019

Response #1:
(#2)-Your inquiry has been received and is being reviewed.


Response posted 02/19/2019


Response #2:
Work to be performed on mainline and on the on and off ramps to the stop bar.
Response posted 02/19/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.