Viewing inquiries for 03-1G6204

Submit new inquiry for this project


Inquiry #1: The drainage systems no. 11 - 14 between PM 6.03 and 6.65 are designated to be lined with cured-in-place pipe (CIPP), but no profile drawings have been provided for this work. Please provide the profile drawings for the CIPP lining work at these locations. Profile drawings are needed to show the vertical configuration of the pipe, including its slope and whether it experiences any grade breaks in its alignment. Profile drawings are also needed to be able to establish the ground cover over the culverts required for the CIPP thickness calculations that must be performed and submitted per specification section 71-3.08A(3).8. If profile drawings cannot be provided, then the following information needs to be supplied for each culvert being lined in lieu of those drawings: 1) pipe invert elevation at upstream end of each pipe being lined, 2) identification and classification of any midline drainage structure on each pipe being lined as well as the pipe invert elevation at each midline drainage structure, 3) pipe invert elevation at the downstream end of each pipe being lined, 4) location and pipe invert elevation of any grade breaks in the alignment of each pipe being lined, and 5) soil cover over the top of each pipe to be used in CIPP thickness calculation submittals.
Inquiry submitted 03/24/2020

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 03/24/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Wednesday, April 1, 2020. Please bid per the current contract documents.
Response posted 04/02/2020




Inquiry #2: The modifications to drawing sheet 19 in Addendum No. 1 make reference to PI's existing in a couple of the culverts being lined with CIPP, but there is no explanation or definition of what a PI is. Please clarify what the abbreviation PI stands for.
Inquiry submitted 04/01/2020

Response #1:
(#2)-Your attention is directed to sheet A3B, of the Standard Plans.
Response posted 04/02/2020




Inquiry #3: Please confirm Inlet/outlet El. provided in addendum 1, elevations given in addendum are 7,400' to 9,000 ft. Road surface in project area appears to be in 730' to 780' range. It would be very helpful to have profile view of lines to be CIPP lined.
Inquiry submitted 04/03/2020

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 04/03/2020


Response #2:
Inlet and outlet elevations are provided per relative survey information. Please bid per the current contract documents.
Response posted 04/06/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.