Viewing inquiries for 03-2F3204

Submit new inquiry for this project


Inquiry #1: In order to accurately quantify roadway cut/fill volumes please provide PDF cross-sections at 25'-50' intervals.

Inquiry submitted 08/14/2018

Response #1:
(#1)-Cross sections were added to the project files for downloading.
Response posted 08/14/2018




Inquiry #2: Is the excavation shown on sheet ECL-1 paid for under the roadside clearing item? What is the specification for the backfill material to replace the excavated material? This is a massive amount of excavation and backfill.
Inquiry submitted 09/28/2018

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 09/28/2018


Response #2:
Yes, the excavation on ECL-1 is paid for under roadside clearing. Your attention is directed to section 20-1.03C(1) of the Special Provisions for information regarding the removal of existing plants.

Your attention is directed to the Roadway Excavation Table on plan sheet Q-1 for information regarding potential backfill material.

Please bid per the current contract documents.

Response posted 10/01/2018




Inquiry #3: Looking at the G2 inlet on drainage plan D-4 drainage system 8 structure d. On the drainage quantities DQ-2, the structure shows no type of grate to use and the weight does not match any of the standard grate specs for Caltrans. Need to know the type of grate needing to be used, there is no grate with 498 lbs.
Inquiry submitted 09/28/2018

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 09/28/2018


Response #2:
Please bid per the current contract documents.
Response posted 10/01/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.