Inquiry #1: Under what item will the control and neutral conductors be paid?
Inquiry submitted 12/10/2021

Response #1:(BI#1)-Refer to Addendum #1, dated December 31, 2021.

Response posted 12/13/2021




Inquiry #2: Irrigation quantities table on sheet IQ-1 doesn’t show a quantity for any sprinklers to be removed? Irrigation removal plan sheet IR-7 only shows some removal of sprinklers not all? IR-1 thru IR-6 shows no removal of any sprinklers? Please show on the irrigation removal plans what sprinklers be removed and include on quantity table on IQ-1.
Inquiry submitted 12/14/2021

Response #1:(BI#2)-Refer to Addendum #1, dated December 31, 2021.


Response posted 12/14/2021




Inquiry #3: PVC Pipe conduit (sleeve) item 49 shown on IP-2 has no specific size? what size should the sleeve be, will it be 8" to accommodate for the mainline and wire. Please advise as to size of pvc pipe conduit.
Inquiry submitted 12/21/2021

Response #1:(BI#3)-Refer to Addendum #1, dated December 31, 2021.


Response posted 12/21/2021




Inquiry #4: The Vegetation Control areas are not included in the quantities for roadway excavation. Is the material considered Z-2 (Aerially Deposited Lead)? Where does it get paid?
Inquiry submitted 12/22/2021

Response #1:(BI#4)-Refer to Addendum #1, dated December 31, 2021.


Response posted 12/22/2021




Inquiry #5: Please clarify the concrete color requirement for Item 68 and 69. Item 68 only specifies to match existing on some locations. Item 69 specifies the texturing pattern but no color. Please clarify
Inquiry submitted 01/03/2022

Response #1:(BI#5)-Bid per current contract documents

Response posted 01/03/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.