Inquiry #1: There are currently no profile drawings for this project, but profile drawings are needed to establish depths for CIPP thickness calculations and excavation quantities and to provide details for required work such as downdrain and drainage structure construction. Please provide the profile drawings for this project. If profile drawings cannot be made available, then in their place please provide all of the following: 1) depths of soil cover to use in CIPP thickness calculations for each culvert being lined, 2) depths of soil cover for each location where excavation is required, 3) details illustrating any downdrain construction required, 4) locations, quantities, and diameters of any laterals &/or downdrains entering the culverts being lined that will need to be reinstated after lining, 5) details for any other work shown where slope, grade or depth will have an impact on the work to be performed.
Inquiry submitted 02/06/2019

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 02/07/2019


Response #2:
An addendum is being prepared to address parts 1, 2, 4, and 5 of this inquiry.
Regarding part 3 of this inquiry your attention is directed to Standard Plans D87A and D97G for Downdrain details.

Response posted 02/13/2019


Response #3:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Friday, February 22, 2019.
Please bid per the current contract documents.

Response posted 02/22/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.