Inquiry #1: Plan sheets C-1 through C-9 show a lot of 30" CIDH piling under both the concrete barrier as well as the Retaining Walls at the at the light pole locations. This CIDH Piling is typically paid per LF under Item Code 490604 for 30" CAST-IN-DRILLED-HOLE CONCRETE PILING and 490605 for 36" CAST-IN-DRILLED-HOLE CONCRETE PILING. Does the department plan on adding the appropriate bid items and quantities to pay for this work ?
Inquiry submitted 10/25/2022

Response #1:Submitted for consideration.
Response posted 10/26/2022


Response #2:Bid under Item code 870200 LIGHTING SYSTEM (LS) LUMP SUM. Please see NOTICE TO BIDDERS AND SPECIAL PROVISIONS, ‘Replace 2nd paragraph of 87-2.01A with:', ‘Lighting system includes: 1. Foundations…’ Also see plan sheets, CONSTRUCTION DETAILS, and CONSTRUCTION DETAILS (C-1) for definition of the ‘LIGHTING FOUNDATION’ that is inclusive of CIDH pile. Refer to all applicable contract documents, standards, including STANDARD PLAN ES-6D, ES-6E, REVISED STANDARD PLAN ES-6A. In addition, see QUANTITY SHEETS Q-5, Q-6, Q-7, Q-8, EQ-1 for NOTES and for table column designation (N) “not a separate bid item” defined below each table, for Luminaire Pole types 21D, 21, 30, 32. Item Code 490604 and 490605 are not pay items for this project.
Response posted 10/28/2022




Inquiry #2: For drainage system 25-W, the quantity shown in the drainage profiles is 195 LFof 18" RCP, but is not shown in the drainage quantity sheets. The total quantity of item 65 (18" RCP) for this project should be 918.9 LF. Please advise.
Inquiry submitted 11/23/2022

Response #1:Submitted for consideration.
Response posted 11/23/2022


Response #2:Please see Addendum 3. Plan Sheets G-20 and GB-20 have been revised.
Response posted 01/13/2023


Response #3:The item was also increased in Addendum 3.
Response posted 01/13/2023




Inquiry #3: Will the department consider moving the bid date for this project to sometime after the Christmas and New Years holidays?
Inquiry submitted 11/29/2022

Response #1:Submitted for consideration.
Response posted 11/30/2022


Response #2:Please Refer to Addendum # 1, "...Bids for this work will be opened on Thursday, January 19, 2023, instead of the original date of Thursday, December 22, 2022..."
Response posted 12/16/2022




Inquiry #4: BID ITEM 18 MOBILE BARRIER 265 Working days. Per the manufacture the rental price is for the unit alone and does not include the tractor or driver. Can you please confirm?
Inquiry submitted 11/30/2022

Response #1:Submitted for consideration.
Response posted 12/01/2022


Response #2:Bidder is guided to review Special Provision 12-3.24D in conjunction with Standard Specification 2018, Section 9, Payment. Please see the quote provided in the handout. Please bid accordingly.
Response posted 01/13/2023




Inquiry #5: Please provide the elevation offsets for Type 60MC and Type 60MGC barriers. This is required for accurate rebar and concrete calculations.
Inquiry submitted 12/01/2022

Response #1:Submitted for consideration.
Response posted 12/05/2022


Response #2:Please see the slope staking notes in the response to bidder inquiry 19.
Response posted 01/13/2023




Inquiry #6: Please provide a freeway lane closure chart for EB 80 from PM 8.71-10.02. Chart G7 covers PM 7.39-8.71 and Chart G8 covers PM 10.02-13.71 leaving a gap from PM 8.71-10.02.
Inquiry submitted 12/06/2022

Response #1:Submitted for consideration.
Response posted 12/08/2022


Response #2:Please see Addendum 4. Chart G7 has been revised.
Response posted 01/13/2023




Inquiry #7: ITEM #97, CB60MC, #98, CB60MGC, & 99F, CB TRANSITION:
The Concrete Barrier Quantity Chart on Q-1, sheet 528 of 667 is ambiguous as to the lengths & limits of each type of Concrete Barrier. In addition, the quantities in the Chart do not match back to the Layout "L" Plans.
Please provide station-to-station for each type of Barrier so the Contractor can quantify the Bid Items accurately.

Inquiry submitted 12/06/2022

Response #1:Submitted for consideration.
Response posted 12/08/2022


Response #2:The length of concrete barrier and concrete barrier transition shown on Q-sheets and L-sheets is comprehensive as to the quantity. Please bid accordingly.
Response posted 01/13/2023




Inquiry #8: In order to bid the concrete barriers type 60MGC and 60MC the variable height information is required. When will the state release this information?
Without it, the contractor cannot bid this work.

Inquiry submitted 12/07/2022

Response #1:Submitted for consideration.
Response posted 12/08/2022


Response #2:Please refer to Slope Stake Notes below for the median concrete barrier heights.

http://website.dot.ca.gov/dist4/construction/contracts/04-0K1604/04-0K160-SLOPE_STAKE_NOTES-072722.pdf
Response posted 01/13/2023




Inquiry #9: Regarding Inquiry #3:
Does the department anticipate pushing this job to bid after the holiday? The current bid date will make the post-bid paperwork due right after the December 26th Christmas holiday. Firms will likely be short –staffed and possibly even closed for the holiday week, making it difficult to obtain written DBE confirmations. Please consider a bid date change giving contractors the proper amount of time to submit responsive post-bid paperwork.

Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Please Refer to Addendum # 1, "...Bids for this work will be opened on Thursday, January 19, 2023, instead of the original date of Thursday, December 22, 2022..."
Response posted 12/16/2022




Inquiry #10: Electrical system plan sheets indicate construction note 34 however not on the legend. What does C/N 34 entail to bid accordingly. As an example please refer to plan sheet E-12.
Inquiry submitted 12/12/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:There does not appear to be a Construction Note 34 in the legend of E-1 and E-12. Kindly clarify.
Response posted 01/13/2023




Inquiry #11: Electrical system plan sheets indicate construction note 34 however not on the legend. What does C/N 34 entail to bid accordingly. As an example please refer to plan sheet E-12.
Inquiry submitted 12/12/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:There does not appear to be a Construction Note 34 in the legend of E-1 or E-12. Kindly clarify.
Response posted 01/13/2023




Inquiry #12: Regarding construction note 27 and 28 on legend sheet E-1; C/N 27 indicates "slip base" and C/N 28 indicates "Type 15 FBS Standard" - When noted together on plan sheet for example on E-2 - please clarify if pole would be installed for each note or would contractor install a Type 15 FBS Standard Slip Base (only 1 pole)?
Inquiry submitted 12/12/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:There does not appear to be a Construction Notes 27 or 28 in the legend of E-1 and E-2. Kindly clarify.
Response posted 01/13/2023




Inquiry #13: Regarding C/N 25: Legend notes existing conduit. However, on plan sheet drawn as bold. Please advise if new conduit is to be added. (example E-44)
Inquiry submitted 12/12/2022

Response #1:Submitted for consideration.
Response posted 12/14/2022


Response #2:There does not appear to be a Construction Note 25 in the legend of E-1 and E-44. Kindly clarify.
Response posted 01/13/2023




Inquiry #14: Please let contractors know where to find a list of attendees at the mandatory prebid meeting.
Inquiry submitted 12/13/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:Submitted for consideration.
Response posted 12/16/2022


Response #3:The following Prime and Sub Contractors attended the Mandatory Virtual Prebid Meeting 04-0K160:

GHILOTTI BROS
VANGUARD CONSTRUCTION
O.C. JONES & SONS INC
ANVILBUILDERS
TEICHERT CONSTRUCTION
GORDON N BALL INC
GHILOTTI CONSTRUCTION COMPANY
DESILVA GATES CONSTRUCTION
BAYCITIES
Response posted 12/16/2022




Inquiry #15: Starting with this project on 1/19 District 04 has three projects totaling $172M bidding in five business days as well as District 03 having a $220M project. It takes a tremendous effort with many resources to close out these projects. It would be very much appreciated if the projects could be spaced out so only one large project is bidding in any given week. Thank you.
Inquiry submitted 12/20/2022

Response #1:Submitted for consideration.
Response posted 12/21/2022


Response #2:Please be aware that project has already been delayed from 12/22/2022. The bid open date not expected to change again.
Response posted 01/13/2023




Inquiry #16: Section 13 states This project's risk level is 2. Will Caltrans pay for Prepare Storm Water Pollution Prevention Plan?
Inquiry submitted 12/20/2022

Response #1:Submitted for consideration.
Response posted 12/21/2022


Response #2:Please see Item 21, PREPARE WATER POLLUTION CONTROL PROGRAM.
Response posted 01/13/2023




Inquiry #17: Section 13 states This project's risk level is 2. Will Caltrans pay for Prepare Storm Water Pollution Prevention Plan?
Inquiry submitted 12/20/2022

Response #1:Submitted for consideration.
Response posted 12/21/2022


Response #2:Please see Item 21, PREPARE WATER POLLUTION CONTROL PROGRAM.
Response posted 01/13/2023




Inquiry #18: Will alternative storm drain pipe materials be granted consideration for substitution. Under Topic 857 – Alternative Materials, in the Caltrans Highway Design Manual (HDM), 857.1 Basic Policy states “When two or more material meet the design service life, and structural and hydraulic requirements, the plans and specifications must provide for alternative pipes, pipe arches, overside drains, and underdrains to allow for optimal selection by the contractor.” Will corrugated polypropylene, as described in Caltrans Standard Specifications Section 64-2.02E be considered?


Inquiry submitted 01/04/2023

Response #1:Submitted for consideration.
Response posted 01/05/2023


Response #2:No. Alternative storm drainpipe materials will not be granted consideration for substitution. The bidder should bid accordingly.
Response posted 01/13/2023




Inquiry #19: In order to bid the concrete barriers type 60MGC and 60MC the variable height information is required. When will the state release this information?
Without it, the contractor cannot bid this work.

Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Please refer to Slope Stake Notes below for the median concrete barrier heights.

http://website.dot.ca.gov/dist4/construction/contracts/04-0K1604/04-0K160-SLOPE_STAKE_NOTES-072722.pdf
Response posted 01/09/2023




Inquiry #20: Please confirm Item # 96 - Alternative Crash Cushion Systems quantities? Bid Item List calls out for 6 EA and the Summary of Quantities calls out for 3 EA? Thank you
Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Please bid per current Contract documents.
Response posted 01/13/2023




Inquiry #21: Please correct the post miles shown on the drawings cover sheet #1 of 667. Currently showing 6.5 miles long with beginning work PM 7.3 and ending work PM 13.8, but when I am using stationing shown on sheet K-1 through k-3, this project is almost 14 miles long. Please clarify.
Inquiry submitted 01/12/2023

Response #1:The project is almost 14 miles long. Please be aware the post miles restart at each county line.
Response posted 01/13/2023




Inquiry #22: Do you require 0.50' AB under concrete barriers as shown on sheets X-1 through X-3 or 0.33' HMA as shown on sheets C2 & C4? There is no method of payment for the HMA work.
Inquiry submitted 01/12/2023

Response #1:Submitted for consideration.
Response posted 01/13/2023


Response #2:The bidders may bid for placing AB, per Plan Sheets X-1 through X-3.
Response posted 01/13/2023




Inquiry #23: Bid inquiry 5 was asked 12/1/2022, it took the state 6 weeks to reply, 1/13/2023( 6 days before the bid opening date), there are 1100 pages of slope stake notes to be analyzed and calculated. There is not enough time to provide an accurate quote for the concrete barriers. We ask that the state extend the bid opening date by 2 weeks.
Inquiry submitted 01/16/2023

Response #1:Submitted for consideration.
Response posted 01/17/2023


Response #2:Please be aware the bid open date is unchanged.
Response posted 01/18/2023




Inquiry #24: The irrigation drawings show new irrigation wires. However, these is not bid item for control and neutral conductors.
Please clarify under what bid item is the new wire shown will be paid.

Inquiry submitted 01/16/2023

Response #1:Submitted for consideration.
Response posted 01/17/2023


Response #2:As the bids will be opened shortly, please bid per current contract documents.
Response posted 01/18/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.