Inquiry #1: On sheet E-8 it is not clear what is bold in the Pole and equipment schedule.

It get confusing that the existing pole letters are changed between E-5 and E-6

Lighting poles 00312 and 00282 are RS on E5 but are re-lamped on E-6 but 00322 on E-5 is 002852 of E6 confusing

thank you


Inquiry submitted 10/11/2018

Response #1:Submitted for consideration.
Response posted 10/12/2018


Response #2:a) Bold symbols refer to new if otherwise indicated.

b) Follow the new Pole and Equipment schedule and match existing to the new schedule.

a) 00282 shall be RS; 000312 shall remain and relamped; Renumbered 000282 as 000322 and 000292 as 000282. An addendum will be issued to make these corrections.
Response posted 10/24/2018


Response #3:a) Bold symbols refer to new if otherwise indicated.

b) Follow the new Pole and Equipment schedule and match existing to the new schedule.

c) Submitted for consideration.
Response posted 10/24/2018




Inquiry #2: Are cross sections available for this project?
Inquiry submitted 11/16/2018

Response #1:You can download thecross sections below:

www.dot.ca.gov/dist4/construction/contracts/04-151614/151614_XSections.zip
Response posted 11/16/2018




Inquiry #3: The total quantity for 18" APC appears to be incorrect on both the Drainage Quantity sheets and the Bid Book.
Inquiry submitted 11/16/2018

Response #1:Submitted for consideration.
Response posted 11/16/2018




Inquiry #4: Please issue new cross sections that show the T1 Line "LT".
Inquiry submitted 11/26/2018

Response #1:Submitted for consideration.
Response posted 11/26/2018


Response #2:Bid as per plans.
Response posted 11/27/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.