Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 04-1Q8604

Submit new inquiry for this project


Inquiry #1: Please confirm that all water costs incurred during plant establishment and throughout the construction period will not be considered as part of this contract as included by bidding contractors and provided by the District. Also, please indicate proposed water sources for purposes of watering areas where CAM coupler connections are proposed.
Inquiry submitted 05/06/2019

Response #1:Submitted for consideration.
Response posted 05/06/2019


Response #2:Water is available at existing water meter located at Old Redwood Highway (refer to sheet IP-3), and can be used to furnish water to irrigate cam coupler assemblies provided contractor furnishes water truck to fill and transport water to the cam coupler assemblies within the project limits. Contractor may obtain water for cam coupler assemblies from other sources.
Response posted 05/07/2019




Inquiry #2: Please confirm that the two (2) cam coupler assemblies shown on sheet LP-2 will be required for this contract; these are plumbed to a pressurized mainline system from point of connection 'A' at Old Redwood Highway.
Inquiry submitted 05/09/2019

Response #1:"Submitted for Consideration."
Response posted 05/09/2019


Response #2:The cam couplers are required. Contractor may choose to irrigate from the cam couplers prior to completion of the plumbed meter connection, or fill from the cam couplers for use at truck watered areas.
Response posted 05/13/2019




Inquiry #3: Please confirm and specify locations of Check & Test Existing Irrigation Facilities as required by bid item #21; drawings are not specific to one or any locations.
Inquiry submitted 05/09/2019

Response #1:"Submitted for Consideration."
Response posted 05/09/2019


Response #2:Check and test is required at the existing meter and backflow preventer shown on IP-3.
Response posted 05/13/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.