Viewing inquiries for 04-281204

Submit new inquiry for this project


Inquiry #1: Would Caltrans release digital files for the alignments, existing and finished grade surfaces in an .XML or .DWG format to expedite and increase accuracy of takeoffs.
Inquiry submitted 11/30/2021

Response #1:Submitted for consideration.
Response posted 12/01/2021


Response #2:Caltrans will not be providing any plans in .XML format.
Response posted 12/07/2021




Inquiry #2: There are multiple stage signs shown on plan sheet 235-292(TH-1 Thru TH-58), but there is no quantity sheet with the size of the sign panels and method of installation.
For example on sheet 263 sign #2C-6 & 2C-7 are G8-16, which are specials temp signs with out sizes of the sign panel.
All the stage signs have sign #'s, just need Q sheet with the sign number.

Inquiry submitted 12/01/2021

Response #1:Submitted for consideration.
Response posted 12/01/2021


Response #2:Please use the tables (link below) together with Sheet SD-2.

http://website.dot.ca.gov/dist4/construction/contracts/04-281204/BI2/BI2_tables.zip
Response posted 12/14/2021




Inquiry #3: In regards to question #1 answer, we request that Caltrans reconsider releasing XML files, not plans. Historically, in past large dirt projects, Caltrans has released these digital surface type files which include the existing surface, the FG surface and alignment surfaces allowing the contractors to build a more concise takeoff model increasing accuracy.
Inquiry submitted 12/07/2021

Response #1:Submitted for consideration.
Response posted 12/07/2021


Response #2:XML files are not available.
Response posted 01/31/2022




Inquiry #4: When will the link for the mandatory prebid meeting on January 4th be available?
Inquiry submitted 12/15/2021

Response #1:The Duty Senior will mail out the link to registered bidders when the link becomes available.

To register, you can email the Duty Senior at
D4.Construction.Duty.Senior@dot.ca.gov

Response posted 12/16/2021




Inquiry #5: The Traffic Handling Plans sheets TH-1 thru TH-58 (plan pages 236-292) show existing K-Rail remaining from previous stages (in lightly hatched lines); however, a lot of these existing K-Rails conflict with work areas to be built, and some of the existing K-rails from previous stages go thru the middle of some work areas. Please provide revised Traffic Handling Plans that show which K-Rail is to remain from previous stage.
Inquiry submitted 12/20/2021

Response #1:Submitted for consideration.
Response posted 12/20/2021


Response #2:See Amddendum 1.
Response posted 01/27/2022




Inquiry #6: Ditto on inquiry no. 5. Krail remaining from previous stage is not clear, and we can not figure total need of krail per stage.
example sheet 242 and 252, stage 1b - 2a TG1 110+57.5-123+43 south bound left side 27.6-30.7, page 252 shows krail from previous stage, does not address crash barrels or how much krail stays from 1b. Very confusing and time consuming endeavor, will prob. need more time to bid also.
quantity take off for krail is not typical, usually Caltrans breaks down by run, we have a total per stage?
please clarify.

Inquiry submitted 12/24/2021

Response #1:Submitted for consideration.
Response posted 12/24/2021


Response #2:See Addendum 1.
Response posted 01/26/2022




Inquiry #7: appears to be 112 ea various types of oaks to be planted, what item do they get paid in?
Inquiry submitted 12/29/2021

Response #1:Submitted for consideration.
Response posted 12/29/2021


Response #2:See Addendum 1.
Response posted 01/31/2022




Inquiry #8: The CA High Design Manual Section 850-34 dated December 30th, 2015 warns against specifying plastic pipe in areas with a potential for fire. This project lists Alternative Pipe Culvert in the Bid Schedule. Will Caltrans still allow for plastic pipe to be used on this project?


Inquiry submitted 01/03/2022

Response #1:Submitted for consideration.
Response posted 01/03/2022


Response #2:Yes, plastic pipe is allowed.

Response posted 01/05/2022




Inquiry #9: For the bid item to prepare and stain concrete. On areas of work with Multi-Color Stain work (Ashlar Stone, and Random Cut Stone Texture) is there a specific Percentage distribution desired of the base and two accent colors, or should we bid assuming equal distribution?


Inquiry submitted 01/05/2022

Response #1:Submitted for consideration.
Response posted 01/05/2022


Response #2:Per SSP section 78-4.04A(4)(b):
-test panels are required; if ordered additional test panels will be constructed until a satisfactory color is attained.

Per SSP section 78-4.04B(2)(a):
-at least two accent colors are required.
-Ashlar Stone to have base color #36559, equal quantity accent colors at 75% cover each: #31575, and #31667 -Random Cut Stone to have base color #36559, with overlaid accent: #31575 @ 10% cover, and #35042 @ 90% cover

(colors above are AMS-STD-595 typically)

Response posted 01/28/2022




Inquiry #10: Would Caltrans consider postponing the bid date for this project 2-3 weeks? We need more time to solicit and communicate with potential DBE subcontractors and suppliers in order to achieve the 22% DBE goal.
Inquiry submitted 01/07/2022

Response #1:Submitted for consideration.
Response posted 01/07/2022


Response #2:Request noted. Unless if an addendum is issued, the project will bid as scheduled.
Response posted 01/10/2022




Inquiry #11: Can you provide the list of attendees and the slide presentation for the prebid meeting on Jan. 4, 2022?
Inquiry submitted 01/10/2022

Response #1:Follow the links below to get the list of attendees and the slide show.

List of Attendees - http://website.dot.ca.gov/dist4/construction/contracts/04-281204/PreBidMeet/ListAttendees_04-281204.pdf

Slide Show - http://website.dot.ca.gov/dist4/construction/contracts/04-281204/PreBidMeet/PrebidMeet_SlideShow.pptx


Response posted 01/10/2022




Inquiry #12: Copy of pre bid attendees list from the 1/4/22 walk through of HMA, Rdwy Excavation, Structural Conc and Modifying Lighting Systems 04-281204 project.
Inquiry submitted 01/11/2022

Response #1:See Bidder Inquiry #11. See link below -

Bidder Inquiries - http://ppmoe.dot.ca.gov/des/oe/inquiry/view.php?p=04-281204
Response posted 01/11/2022




Inquiry #13: TH-23 shows an additional temporary shoring location at approx. station TG1 113+00, There is no sheet TH-24 showing how close to k rail the fill will be, the job goes all the way to aprox. TG1 124+00. Can you provide the locations of all temporary shoring with lengths. Real vague for a lumpsum item, please clarify for bidding purposes.
Inquiry submitted 01/12/2022

Response #1:Submitted for consideration.
Response posted 01/12/2022


Response #2:Bid per current plans and specs. This project bids tomorrow, Feb. 1, 2022.
Response posted 01/31/2022




Inquiry #14: On Sheet C-15, some of the pavement sections called on the top left are not the same as the pavement sections called out and referred to on Sheet X-1. For example, on Sheet C-15, pavement section 1 is called out as full depth HMA. But pavement section 1 on Sheet X-1 contains .65' of LCB and .5' of AB2. Pavement section 2 is also called out as full depth HMA, but it contains 1' of AB2. Can Caltrans clarify how the pavement sections on Sheet C-15 are related to the pavement sections on Sheet X-1?
Inquiry submitted 01/13/2022

Response #1:Submitted for consideration.
Response posted 01/13/2022


Response #2:Per the note in the legend, the section numbers shown on C-15 refer to the identical numbers shown on X-1.
Response posted 01/14/2022




Inquiry #15: Pavement Section 8, gore paving, includes minor concrete (stamped). What pattern is being stamped in the surface? Do the gores include integrally colored concrete and if so, what color are we to use?
Inquiry submitted 01/13/2022

Response #1:Submitted for consideration.
Response posted 01/13/2022


Response #2:Intent was to match the color & texture of the truck apron.
Response posted 01/27/2022




Inquiry #16: Is the .2' layer of textured concrete on the truck aprons reinforced?
Inquiry submitted 01/13/2022

Response #1:Submitted for consideration.
Response posted 01/13/2022


Response #2:The 0.20’ Stamped Concrete shown in pavement section number 12 on sheet X-1 is not reinforced.


Response posted 01/16/2022




Inquiry #17: In reference to Standard Specification 20-5.03B(2)(c) for the Rock Blanket, it says that the rock must be clean, smooth, and obtained from a single source. Are you requesting smooth rock consistent with river run cobblestone or rock similar to Sonoma/Napa fieldstone that has at least one smooth side? Is there an example of, or an installation of the type of rock blanket you are requesting so that we may visit the site in order to produce something similar?
Inquiry submitted 01/13/2022

Response #1:Submitted for consideration.
Response posted 01/13/2022


Response #2:Smooth rock / river run cobble is preferred.

An example can be seen in the roundabouts at SR 29 NB Ramps and First Street, in the City of Napa (see pic below).


Response posted 01/27/2022




Inquiry #18: This project is in a Low Mountain pavement climate region. Does the reinforcing bar for
Item #89-Continuously Reinforced Concrete Pavement need to be epoxy coated ?

Inquiry submitted 01/17/2022

Response #1:Submitted for consideration.
Response posted 01/18/2022


Response #2:The reinforcement of the CRCP does not need to be epoxy coated.
Response posted 01/20/2022




Inquiry #19: In your response to Inquiry #14, you say to refer to the section numbers on Sheet X-1. So the description of Section 1 on Sheet C-15 is not Full Depth HMA and is incorrect. Can you correct the pavement descriptions on Sheet C-15 to correspond with pavement structural sections on Sheet X-1? And if C-15 is correct, what are the section depths of the Full Depth HMA?
Inquiry submitted 01/18/2022

Response #1:Submitted for consideration.
Response posted 01/18/2022


Response #2:Pavement sections shall be constructed per the Typical section sheets (X-1). There is a Reference # provided on C-15 that correlates to the SAME pavement section #'s provided on X-1. The "FULL DEPTH HMA" text in the legend was only intended to be descriptive of the desired surfacing. All quantities and pavement sections are per X-1.
Response posted 01/20/2022




Inquiry #20: There is Dry seed item in EC Type 2 (Step 2) per EC Legend/ ECL-1. Please confirm which bid item in bid item list that Dry Seed belongs to.
Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:Bid per plans and specs. No further information will be provided.
Response posted 01/24/2022




Inquiry #21: Addenda 1 was issued on 1/18/2022, with 109 revised plan sheets (18% of the original), 7 specification revisions, and 20 Bid Quantity revisions, we consider this Addenda a major revision. The revisions are further complicated by the projects already complex construction staging. We respectfully request a bid date push of at least three weeks, in order to review and incorporate this very large addendum. We would ask Caltrans to also consider the very high DBE goal established for this project. Because of this high DBE goal, we need more time to outreach and communicate these extensive Addendum changes to the DBE firms we are working with to bid on this project.

Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:The project will bid tomorrow, Feb. 1, 2022.
Response posted 01/31/2022




Inquiry #22: The current contract documents do not list a method of payment, specification, or details on what to do with the existing roads and temporary roads used for detours after the new alignment is open. Are the roads to remain in-place, be obliterated in-place, or removed and off-hauled and the void filled with some type of specified fill material?
Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:Excavation of detour materials has been included in Bid Item #40: Roadway Excavation, as shown on sheet Q-2 and should be backfilled per typical sections.
Response posted 01/24/2022




Inquiry #23: Please verify the quantities for BI# 79. Hot Mix Asphalt (Type A), BI# 86. Tack Coat, and BI# 134. Minor Concrete (Stamped Concrete).
Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:Bid per current plans and specs. No further information will be provided.
Response posted 01/27/2022




Inquiry #24: Does all the temporary HMA required for the project get paid for in BI# 79. Hot Mix Asphalt (Type A)?
Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:All quantities for temporary HMA are paid for as BI #79: Hot Mix Asphalt (Type A), and is shown on sheet Q-1.
Response posted 01/24/2022




Inquiry #25: Section D-D on Sheet TH-16, Stage 2A, shows temporary shoring for embankment at the back side of the southbound 29 side of the roadway. In this area, the roadway on the "TG 1" line is at or near OG, not on an embankment requiring shoring. The main fills don't start until Stage 2B, with possibly using a temporary shoring wall at the right edge of northbound 29 since the future highway is higher than the "TG 1" line. Can Caltrans check Section D-D and correct it, if necessary, so it shows current traffic conditions?
Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:Section D-D, shown on TH-16 is correct. The shoring as shown, is for excavating below EG to construct the southern roundabout (left side of section D-D). See Sheet PS-7 for profile.
Response posted 01/24/2022




Inquiry #26: On Sheet TH-16, Stage 2A, can Caltrans show a cross section at Station 101+00 on the "TG 1" line? We think there may be a conflict between the construction in this stage and the NB/SB 29 traffic lanes.
Inquiry submitted 01/21/2022

Response #1:Submitted for consideration.
Response posted 01/21/2022


Response #2:Construction of southern roundabout is made possible with "Temp Shoring for Embankment" (in this case for cut condition). No conflicts exist as shown. Section is identical to Section D-D as shown on sheet TH-16.
Response posted 01/24/2022




Inquiry #27: In Stage 2B, we build a partial fill for the construction of the new northbound lanes of Highway 29. In what stage do we complete the fill over the "TG-1" line?
Inquiry submitted 01/21/2022

Response #1:Embankments are planned to be constructed between stages 3E and 5E, as shown on SC- 13 and SC-20. While shown on SC-20, Note 1 on sheet SC-1 permits non-conflicting work to be performed prior to as shown, with approval from the engineer.
Response posted 01/24/2022




Inquiry #28: You show type 17 and type 16 traffic signal standards with 30 and 35; signal mast arms. Per Caltrans standards these pole shafts will not accommodate these arms. Are the arms lengths listed wrong or are the pole shafts listed wrong?
Inquiry submitted 01/24/2022

Response #1:Submitted for consideration.
Response posted 01/24/2022


Response #2:Can the bidder specify a sheet no. or (pole #) to reference in our response?
Response posted 01/24/2022


Response #3:Question withdrawn.
Response posted 01/31/2022




Inquiry #29: Plan sheet E-16 calls out for installation of a VMS panel. There is nothing in the special provisions to let us know what type of sign to provide. Can you please provide specifications for this VMS sign panel.
Inquiry submitted 01/28/2022

Response #1:Section 87-10.02 of the Special Provisions, as added by Addendum 1.
Response posted 01/31/2022




Inquiry #30: Sheet E-6 Appears to show existing Conduit and boxes despite E-5 and E-7 showing New conduits heading into and from E-6. This appear to be an error. Please confirm that E-6 Should be all new Conduit and Boxes.
Inquiry submitted 01/30/2022

Response #1:Submitted for consideration.
Response posted 01/31/2022


Response #2:All electrical work shown on Sheet E-6 shall be proposed/new.
Response posted 01/31/2022




Inquiry #31: Where is the work shown on Sheet 605 quantified/paid?
Inquiry submitted 01/31/2022

Response #1:Per the station offset shown on Sheet C-39 (80/605) this transition is paid for as Conc BARRIER (TYPE 60M). This would be in Bid Item 171.
Response posted 01/31/2022




Inquiry #32: Plan sheet E-16 shows to supply and install a VMS sign panel. There is nothing in the specifications to show what type of VMS panel to supply and install. Please provide a specification for the VMS panel.
Inquiry submitted 01/31/2022

Response #1:Section 87-10.02 of the Special Provisions, as added by Addendum 1.
Response posted 01/31/2022




Inquiry #33: Unless Caltrans supplies more information, the VMS signs are impossible to quote. There is nothing in the plans or specs other than a brief note. Please provide more information on the VMS requirements.
Inquiry submitted 01/31/2022

Response #1:Section 87-10.02 of the Special Provisions, as added by Addendum 1.
Response posted 01/31/2022


Response #2:Section 87-10.02 of the Special Provisions, as added by Addendum 1.
Response posted 01/31/2022




Inquiry #34: Regarding the response to inquiry #30, Will an Addendum be issued to help prevent confusion on the bid sheets?
Inquiry submitted 01/31/2022

Response #1:All electrical work shown on Sheet E-6 shall be proposed/new.
Response posted 01/31/2022




Inquiry #35: Please provide an answer to Inquiry #20: There is Dry seed item in EC Type 2 (Step 2) per EC Legend/ ECL-1. Please confirm which bid item in bid item list that Dry Seed belongs to.
Inquiry submitted 01/31/2022

Response #1:Bid per plans and specs. No further information will be provided.
Response posted 01/31/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.