Inquiry #1: You show a VMS sign on page E-12. Is this a new sign or an existing sign that is getting a new control unit? The notes do not state that the sign is new or to be installed.
Inquiry submitted 12/04/2020

Response #1:Submitted for consideration.
Response posted 12/04/2020


Response #2:The VMS sign shown at the bottom/left corner of Sheet E-12 is a new sign. The symbols on Sheet E-1 is where you look to confirm that this VMS sign is new.
Response posted 12/04/2020




Inquiry #2: You show a VMS sign on page E-12. Is this a new sign or an existing sign that is getting a new control unit? The notes do not state that the sign is new or to be installed.
Inquiry submitted 12/04/2020

Response #1:Same question as above (#1).
Response posted 12/04/2020




Inquiry #3: We found some discrepancies on the quantities on sheet EQ-1. One example is on Location 1 which shows +- 40% discrepancy on the quantities for the Conduits, Conductors and DLC. Please verify and confirm all the quantities at various locations on the Modifying Traffic Monitoring Stations table.
Inquiry submitted 12/04/2020

Response #1:Submitted for consideration.
Response posted 12/04/2020




Inquiry #4: We found some discrepancies on the quantities on sheet EQ-1. One example is on Location 1 which shows +- 40% discrepancy on the quantities for the Conduits, Conductors and DLC. Please verify and confirm all the quantities at various locations on the Modifying Traffic Monitoring Stations table.
Inquiry submitted 12/04/2020

Response #1:Same as question above (BI#3).
Response posted 12/04/2020




Inquiry #5: We found some discrepancies on the quantities on sheet EQ-1. One example is on Location 1 which shows +- 40% discrepancy on the quantities for the Conduits, Conductors and DLC. Please verify and confirm all the quantities at various locations on the Modifying Traffic Monitoring Stations table.
Inquiry submitted 12/04/2020

Response #1:Submitted for consideration.
Response posted 12/06/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.