Viewing inquiries for 04-2Q0304

Submit new inquiry for this project


Inquiry #1: Please refer to Section 48-3.02B of the Special Provisions. The specification requires, "For bridge no. no. 28-0137R, temporary supports must resist the described lateral design forces applied at the point where bearing assembly repair meets the superstructure.

It is standard practice to utilize the existing abutment in the temporary support system to
resist lateral forces.

Will the contractor be allowed to use the existing structures to resist lateral forces? Thank you.

Inquiry submitted 12/01/2020

Response #1:Submitted for consideration.
Response posted 12/01/2020


Response #2:Please bid per current contract documents.
Response posted 12/07/2020




Inquiry #2: There appears to be a discrepancy between the item quantities listed on the bid list and the quantity shown on the plans for access doors. The bid list shows two doors under bid item 26, and one door under bid item 43. The plans call out for four access doors on the Access Door Table on Sheet 13 of 18, and one access door at Appian Way, sheet 7 of 18, for a total of five. These are not Final Bid Items. Please advise as to how this discrepancy should be addressed in the quote.
Inquiry submitted 12/02/2020

Response #1:Submitted for consideration.
Response posted 12/03/2020


Response #2:No discrepancy. The Access Door Table shown on sheet 37 of 42 is a summary of the access doors. The Access Door Table is consistent with the Bid Item List, Items 26 and 43 . Please bid per current contract documents.
Response posted 12/07/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.