Viewing inquiries for 04-3W9304

Submit new inquiry for this project


Inquiry #1: Please provide a gradation for the rock to be used for:
1. Rock Blanket and
2. Rock Mulch

Inquiry submitted 11/30/2022

Response #1:Submitted for consideration.
Response posted 12/01/2022


Response #2:1. Rock Blanket - Please refer to Caltrans Standard Specifications section 20-5.03B(2)(C) for rock gradation for rock blanket
2. Rock Mulch - Per SSP 20-5.03E(2), please refer to Caltrans Standard Specifications section 72-2 for gradation for rock used for Rock Mulch.
Response posted 12/12/2022




Inquiry #2: Please provide intended thickness of the rock blanket. The detail for this has no vertical depth.
Inquiry submitted 12/01/2022

Response #1:Submitted for consideration.
Response posted 12/05/2022


Response #2:Submitted for consideration.
Response posted 12/05/2022


Response #3:Rock Blanket shall be 6" thick per detail on sheet LD-4.
Response posted 12/12/2022




Inquiry #3: The Special Provisions call for 90 working days to complete this project. We do not think that there are enough working days to complete the construction portion of this project.
Please consider doubling the number of working days.

Inquiry submitted 12/02/2022

Response #1:Submitted for consideration.
Response posted 12/06/2022


Response #2:Caltrans thinks that 90 working days is enough to do the work.
Response posted 12/12/2022


Response #3:Contractor is allowed a 55-day delayed start as part of SSP 8-1.04C.
Response posted 12/12/2022




Inquiry #4: We cannot find any information in the Information handout regarding the analyticals for the Type Z-2 ADL soil to be removed & transported. Can you please provide analyticals so that we can estimate the correct off haul & disposal costs?
Inquiry submitted 12/05/2022

Response #1:Submitted for consideration.
Response posted 12/08/2022


Response #2:Please see the soils report included in the information handout with Addendum 1.
Response posted 12/16/2022




Inquiry #5: Please clarify the sizes of the cam couplers require for this job.
Inquiry submitted 12/05/2022

Response #1:Submitted for consideration.
Response posted 12/08/2022


Response #2:Please see Cam Couplers sizing on Irrigation Quantities sheet IQ-1.
Response posted 12/08/2022


Response #3:Please see Cam Couplers sizing on Irrigation Quantities sheet IQ-1.
Response posted 12/12/2022




Inquiry #6: Please confirm the removal depth of the ADL Type Z-2 under Bid Item 13 is to be 6" only to match the depth of the Rock Blanket as the Special Provisions Section 14-11.08C states 6" to 16". If the depth is greater than 6", the ADL Type Z-2 excavation quantity will increase beyond the EE quantity.
Inquiry submitted 12/07/2022

Response #1:Submitted for consideration.
Response posted 12/08/2022


Response #2:The removal depth of Roadway Excavation (Type Z-2) (Aerially Deposited Lead) ranges from 6" minimum to 12" maximum. This accounts for the excavation for the installation of Rock Blanket as well as the depth required to install the rock mulch, shown on Landscape Detail sheet LD-4.
Response posted 12/12/2022




Inquiry #7: The Landscape Layout Plan, LL-1, shows the following: Permit to Enter Area.
Please clarify if there is a fee associated with this permit and how much is the fee. Under what item is the fee being paid?

Inquiry submitted 12/08/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:There are no fees associated with the Permit to Enter and Construct.
Response posted 12/12/2022




Inquiry #8: Please provide a watering schedule and water usage calculation chart for 750 working days plant establishment for bidding purposes so all the bidders can bid this requirements equally.
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Contractor shall provide a watering schedule for the project, including the plant establishment period of 750 days. Please see SSP 20-4.01C(1) regarding watering schedules.
Response posted 12/12/2022




Inquiry #9: Refer to sheet IP-1, match line at the bottom of this sheet is referring to sheet IP-2 for continuation. However, sheet IP-2 is not provided. Please clarify.
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:This plans set does not have sheet IP-2. Sheet IP-1 should not refer to IP-2 for continuation.
Response posted 12/12/2022




Inquiry #10: Provide the location or plan sheet number for bid item no. 44 - 2 1/2'' Plastic Pipe (SCH 40) (supply line).
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Please see plan sheet IP-1, near the manifold for CCA ‘B’, and the quantities on sheet IQ-1, IRRIGATION QUANTITIES, (LATERAL SIDE OF CONTROL VALVE) CCA 'B'.
Response posted 12/16/2022




Inquiry #11: A call out on sheet IP-1 indicates "install one bubbler per each Rosmarinus and Heteromeles, see planting plan". Plants are supposed to be Rosmarinus and Arctostaphylos per sheet PP-1 - Planting plan. Please advise.
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Sheet PP-1 is correct, one bubbler is to be installed at each ground cover shrub per sheet PP-1.
Response posted 12/16/2022




Inquiry #12: The mulch callout shown on sheet PP-1 at two loops and rock mulch areas shown at the same locations on sheet LL-1 overlapping each other. Please advise.
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Please be aware the mulch callout on sheet PP-1 takes into account the Rock mulch areas shown on sheet LL-1. Therefore, there is no overlap of materials.
Response posted 12/15/2022




Inquiry #13: Provide the installation depth for rock mulch material.
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Please see plan sheet LD-4, Detail ‘Rock Mulch’. The ‘Rock’ in the detail is to be one layer of the rock placed on filter fabric on original grade of the 80' to 175' area. This includes the 36” wide by 12” deep key.
Response posted 12/16/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.