Inquiry #1: Per the spec section 39.2.01(A) it implies that MRI information will be provided by the Department at the time of advertisement, will that information be available prior to bid day?
Inquiry submitted 10/25/2021

Response #1:Copy and paste the link below to get the MRI files:

http://website.dot.ca.gov/dist4/construction/contracts/04-4J3004/BI1/BI1_MRI.zip
Response posted 10/26/2021




Inquiry #2: Sheet L-5 and L-6 show a 2125' GR run. Plans and summary of quantities do not show
anything about a rail strengthening. After looking at the GR run, I counted objects where rail was going to be closer then 4ft to structure. Will Caltrans provide an quantity of rail strengthening's for project?

Inquiry submitted 10/26/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:Yes, The Q-2 will be updated and it will show the number of Rail Strengthened Midwest guardrail system as an information only and there will not be a bid item number. The total Rail strengthening for the project would be 7, 5 would be at sheet L-5 and L-6 and 2 would be at sheet L-10.
Response posted 11/10/2021




Inquiry #3: Can you please provide the EXIST smoothness data in a simple PPF or PVP format?
Inquiry submitted 10/27/2021

Response #1:Submitted for consideration.
Response posted 10/28/2021


Response #2:Copy and paste the link below to get the EXIST smoothness data:
http://website.dot.ca.gov/dist4/construction/contracts/04-4J3004/BI1/BI1_MRI.zip

Response posted 11/08/2021


Response #3:Copy and paste the link below to get the EXIST smoothness data:
http://website.dot.ca.gov/dist4/construction/contracts/04-4J3004/BI3/BI3_PVP.zip
Response posted 11/10/2021




Inquiry #4: Based on the current Typical Cross Sections (X-1) and the Layouts, contractor cannot determine the new Pavement Structural Section(s) at the Driveways and Local Roads.

In Typical Cross Sections (X-1) shoulders only extend 0-4' (zero to four feet) and the Driveways and Local Roads extend beyond the max shoulder distance of 4' (four feet). Please clarify.

Inquiry submitted 10/27/2021

Response #1:Please refer to the layout sheet that clearly hatched the limit of driveways and local roads overly. The driveway and local road works should be up to the State R/W lines.
Response posted 10/28/2021




Inquiry #5: Provide a detail for the crack treatment.
Inquiry submitted 11/01/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:" Even though the chance of having cracks at depth of 0.50’ is slim, we need to have the bid item in the contract because if we end up needing it in the construction time, there will not be issue with that. So, it will be safer to include crack pay item code in the contract. You may or may not use it."
Response posted 11/12/2021




Inquiry #6: The plans for GR don't show any rail strengthening's for the GR. Could Caltrans provide a quantity for job? After looking over job i counted 6 where GR is closer then 4' to fixed
object.

Inquiry submitted 11/01/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:Yes, The Q-2 will be updated and it will show the number of Rail Strengthened Midwest Guardrail System as an information only and there will not be a bid item number. The total Rail strengthening for the project would be 7. 5 would be at sheet L-5 and L-6 and 2 would be at sheet L-10. We include them in the next addendum.
Response posted 11/10/2021




Inquiry #7: Paving Structure Section #4 on X-1 calls for Cold Plane and RHMA only (no GPI). The table on Q-1, includes quantities of GPI (Paving Mat) for all cold planed surfaces. Will the GPI quantity be updated?


Paving Structure Section #3 is on the shoulders adjacent to Section #2. Section #3 is a 0.5' cold plane, Section #2 is a 0.45' cold plane. Because the existing section at the shoulders is 1.10' of AC, shouldn't the section depths of cold plane and paving match up. The additional 0.05' of cold plane work is difficult, and might be unnecessary for a shoulder.

Inquiry submitted 11/01/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:" No, Q-1 will not be modified, if you decide to put GPI on the main line and shoulders at the same time, you will have enough GPI in case to overlay the shoulder in two lift."
Response posted 11/10/2021




Inquiry #8: Please consider revising the current Layout sheets to show the limits of the shoulders versus the mainline paving. The shoulders as shown on Sheet X-1 get different new structural sections vs. the mainline lanes for the majority of the project.

Please see Sheet L-11 as typical example of the issue we are currently facing. The Cold Plane limits are clearly drawn but we cannot determine the mainline lane vs. the shoulder limits and they are significantly different new structural sections with substantial cost implications for each category.

Note #4 on Sheet X-1 only magnifies the importance of the shoulder limits as the contractors are cautioned that the “Project area is adjacent to known historic resource and biologically sensitive areas, no equipment shall be allowed outside the existing edge of shoulders”

Please consider revising the layout sheet with clear ETW and ES improvements limit lines in order for all contractors reasonably bid the same project.

Inquiry submitted 11/01/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:" The hatching is for cold planning and see X-1 sheet for structural sections."
Response posted 11/10/2021




Inquiry #9: Follow-up for Question #3
What is the paving section for the local roads and driveways? Is it the same as the adjacent shoulder section (pavement structure sections 3 & 4 on X-1) - or does it match the Travel Way sections 1 & 2 (on X-1)?

Inquiry submitted 11/02/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:" Local Roads and Driveways should match the adjacent shoulder section (depending on the post miles on X-1), i.e. not matching the travelled way sections."
Response posted 11/12/2021




Inquiry #10: Please provide a detail for the crack treatment
Inquiry submitted 11/03/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:" There is no detail for the unknown cracks under the pavement. Even though the chance of having cracks at depth of 0.50’ is slim, we need to have the bid item in the contract because if we end up needing it in the construction time, there will not be issue with that. So, it will be safer to include crack pay item code in the contract. You may or may not use it."
Response posted 11/12/2021




Inquiry #11: Confirm that the removal of existing thermoplastic striping be needed prior to the grinding and cold planing operation?
Inquiry submitted 11/05/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:“Cold planing in the project will involve grinding the existing pavement with the traffic stripes and pavement markings. Separate removal of traffic stripes and pavement markings before pavement grinding is not necessary. The mass of ground asphalt will dilute the relatively minor amounts of lead present in the traffic stripes and pavement markings; therefore, the grinding waste residue containing lead from the traffic stripes and pavement markings mixed with asphalt concrete pavement is not a hazardous waste.”
Response posted 11/10/2021




Inquiry #12: Confirm the utilities identified on Plan Sheet 34 (Lower & Raise Frame & Cover) will be done by "others" not within this contract as is stated also on Note 2 of Plan Sheet 19.
Inquiry submitted 11/05/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:We will address this issue in the next addendum.
Response posted 11/10/2021




Inquiry #13: 1) Note: We have submitted 2 other inquiries for this project, and we do not see them posted under the inquiries for the project.

2) Addendum 1 moved the bid date to 11/30/21. Assuming another addendum will follow on this project -- please consider a bid date of 12/7/21. There are other, very large district 4 projects already bidding on 11/30 and 12/1.



Inquiry submitted 11/08/2021

Response #1:Submitted for consideration
Response posted 11/08/2021


Response #2:You will receive response to all of your inquiries. There would be another addendum issued as project schedule permits. If bid opening date needed adjustment, we will do it but we are following Caltrans guidelines.
Response posted 11/10/2021




Inquiry #14: This is in response to your response to bidder inquiry# 3.

You provided the same link for Bidder Inquiry#1 which provides some internet file of a printout from your IP System.

You have multiple data sets on their for a fixed interval of 528 feet, and every operator certified by Cal Trans each year is tested and certified by the use of ProVal.

Therefore, can you please provide the EXIST data in a PPF format as the contractor is required too per section 36-3.01C(2) Inertial Profiler Data?


Inquiry submitted 11/10/2021

Response #1:The link in Bidder Inquiry #3 has been corrected.
Response posted 11/10/2021




Inquiry #15: As stated in Inquiry #9 local roadways and driveways are to be same as the adjacent shoulder sections, but it appears that those quantities are not captured in the respective bid items will this be addressed in the forthcoming Addendum?
Inquiry submitted 11/30/2021

Response #1:Submitted for consideration.
Response posted 12/13/2021




Inquiry #16: In various responses CalTrans has stated "Forthcoming Addendum" when will it issued.
Inquiry submitted 12/09/2021

Response #1:Submitted for consideration.
Response posted 12/12/2021


Response #2:Submitted for consideration.
Response posted 12/13/2021




Inquiry #17: Please clarify the Bid Date is tomorrow 12/15 and CT had stated in Addendum #2 that a future addendum would be issued advising the contractors of additional changes.
Inquiry submitted 12/14/2021

Response #1:Addendum 3 issued Dec. 15, 2021 changed the bid open date to Thursday, January 27, 2022, instead of the original date of Wednesday, December 15, 2021.
Response posted 12/15/2021


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.