Viewing inquiries for 05-0F9704

Submit new inquiry for this project


Inquiry #1: We kindly request to extend the bid date by one week, considering the holiday season during last week of 2021 and first week of the new year.
Inquiry submitted 01/11/2022

Response #1:Submitted for consideration.
Response posted 01/11/2022


Response #2:Refer to Addendum No. 1, dated January 14, 2022.
Response posted 01/18/2022




Inquiry #2: UNKNOWN BID ITEM:
Guardrail work includes Reconstruction of MGS, WB-31 & DTB on the NB Mainline.
Under what Bid Item is this work to be paid?

Inquiry submitted 01/12/2022

Response #1:Submitted for consideration.
Response posted 01/14/2022


Response #2:Per Section 9-1.03 PAYMENT SCOPE of Caltrans Standard specifications 2018: “Payment is: Full compensation for all work involved in each bid item shown on the bid item List by the unit of measure shown for that bid item”. In this case, payment is included in the Bid item 80, CONCRETE BARRIER (TYPE 842 MODIFIED).
Response posted 01/19/2022




Inquiry #3: Regarding "Composite Column Strengthening"

Is Bent 3 Columns the only location to receive "Composite Column Strengthening" ?

Does the material quantity (9,719 sqft.) for “Composite Column Strengthening” called out represent a total estimated material coverage square footage taking in to account the number of layers referenced on sheet 93 of 105 (N1 and N2) in the project plans or is that a concrete surface estimate for the columns ignoring layer counts?

Referencing “Composite Column Strengthening” on sheet 93 of 105 please confirm that N1 Layer call out references an E Glass composite system and the N2 layer call out references a Carbon composite system?

Inquiry submitted 01/20/2022

Response #1:Submitted for consideration.
Response posted 01/20/2022


Response #2:Yes. Only the two columns at Bent 3 require composite column strengthening. The elevation detail on sheet 86 of 105 shows that Note H only applies to the two columns at Bent 3.

Regarding the quantity of Composite Column Strengthening, Section 60-4.07D of the special provisions states the quantity is "…the number of layers shown multiplied by the surface area measured..".

The Carbon FRP system is the only one used for composite column strengthening. Please see plan sheet 93 of 105. The systems that are not applicable have been crossed out.

Response posted 01/26/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.