Viewing inquiries for 05-1C4104

Submit new inquiry for this project


Inquiry #1: Does the Display Panel Frame to Tubular Rail Connection need to be engineered? or Removable? See Sheet C-5, "Rail Connection Per Display Frame Manufactures Recommendation"
The Frame manufacture quote (Spec 20-5.05B) does not include this scope and will need to be custom. If custom, will this connection be paid under bid item 38, or 74?

Inquiry submitted 12/02/2022

Response #1:Your inquiry has been submitted for review.
Response posted 12/02/2022


Response #2:Attention is directed to section 20-5.05B(5) "frame includes... mounting hardware," and bid Item 38 - Fabricated Display Frame. Bid in accordance with Contract Documents.
Response posted 12/07/2022




Inquiry #2: Please confirm bid quantity for Bid item 69 Anti-Graffiti Coating. The bid quantity seems high for only including the exposed surfaces of the abutment and wingwalls.
Inquiry submitted 12/08/2022

Response #1:your inquiry has been submitted for review

Response posted 12/08/2022


Response #2:Attention is directed to Notes #3 and #10 on contract plan sheet 50 of 64. Quantities have been verified. Place your bid per contract documents.
The quantity for bid item 69, anti-graffiti coating, is correct. Refer to Notes #3 and #10 on sheet 50 of 64 of the contract plans. Per Note #3, anti-graffiti coating is shown for exposed smooth concrete surfaces on the wingwalls and abutment faces. Per Note #10, anti-graffiti coating is also shown for the stone masonry bridge rail. Bid per the current contract documents.
Response posted 12/21/2022




Inquiry #3: The bid date is currently Thursday 12/22/22. Some companies will be closed for Christmas on both Friday 12/23/22 and Monday 12/26/22. Due to the close proximity to the Christmas holiday weekend, we request that the bid date be extended at least one week.
Inquiry submitted 12/16/2022

Response #1:Bid opening is scheduled for 12/22/2022. It is not currently anticipated that there will be a change to this scheduled date.
Response posted 12/16/2022




Inquiry #4: Please confirm that the casing insulators for the Water Line shown on Sheet 61 are by others.
Inquiry submitted 12/16/2022

Response #1:Your inquiry has been submitted for review.
Response posted 12/16/2022


Response #2:The Department has confirmed casing insulators for water lines will be completed by others.
Response posted 12/19/2022




Inquiry #5: Can "installing" the bird exclusion device be classified as maintenance of nesting bird exclusion? this would allow installation of the bird exclusion o happen within the channel of alamo pintado creek before May 1st.

Section 14-6.03A Species Protection Area 2 and 3, note 3.

Inquiry submitted 12/19/2022

Response #1:Your inquiry has been submitted for review.
Response posted 12/19/2022


Response #2:Attention is directed to section 14-6.03A and 14-6.10A(3) of the Contract Special Provisions. Please bid in accordance with contract documents. In accordance with section 1-1.01 of the Standard Specifications, submit documents and direct questions to the Engineer.
Response posted 12/21/2022




Inquiry #6: If the contractor submits a Preparedness Plan for rain and waterbody flow events, and this plan is approved, Can the contractor begin the bridge Demo before May 1st?

Based on Section 14-6.03A Species Protection Area 2 and 3, note 3.

Inquiry submitted 12/19/2022

Response #1:Your inquiry has been submitted for review.
Response posted 12/19/2022


Response #2:Attention is directed to Section 14-6.03A of the Contract Special Provisions. Place your bid in accordance with contract documents.
Response posted 12/21/2022




Inquiry #7: Bid item 61 - Is the 16" Welded Steel Casing required to be Epoxy Coated for the full 161 LF? Per Standard Section 70-3.02B(3).
Inquiry submitted 12/19/2022

Response #1:Your inquiry has been submitted for review.
Response posted 12/19/2022


Response #2:Attention is directed to the 2nd paragraph of section 70-7.02B of the Standard Specifications. Please bid per the current contract documents.
Refer to the 2nd paragraph of section 70-7.02B of the Standard Specifications and bid per the current contract documents.
Response posted 12/21/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.