Submit new inquiry for this projectInquiry #1: There is no detail for item #112 Metal (Roadside Sign).
The plans call for signs to be installed on the retaining wall on sheet 40, but no detail is provided.
Inquiry submitted 11/14/2018
Response #1:Submitted for consideration.
Response posted 11/14/2018
Response #2:Refer to Addendum No. 1 dated January 4, 2019.
Response posted 01/07/2019
Inquiry #2: Is the State going to issue a detour plan for closing down the Pasatiempo on ramp to south bound Hwy 17?
Inquiry submitted 12/12/2018
Response #1:Refer to the contract lane closure charts and Caltrans standard plans for closure of the Pasatiempo on ramp. No detour plan will be issued.
Response posted 12/13/2018
Inquiry #3: Section 49-1.03 states that "wet method may be required" for the soldier piles. Section 4.03 has not been modified by the project specifications to allow wet method on soldier piles. Please identify if "wet method" is allowing the use of synthetic slurry to facilitate installation of soldier piles.
Inquiry submitted 01/10/2019
Response #1:Submitted for consideration.
Response posted 01/11/2019
Response #2:Bid per current contract documents.
Response posted 01/20/2019
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.