Inquiry #1: How is the asphalt binder (geosynthetic pavement interlayer) paid?
Inquiry submitted 02/07/2022

Response #1:Submitted for consideration.
Response posted 02/09/2022


Response #2:Bid Item 33 shown in the Special Provision, Page Number 4, should be bid on with asphalt binder material associated with Geosynthetic Pavement Interlayer as included in the bid item number 33, 393004 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC). Please bid accordingly.
Response posted 02/09/2022




Inquiry #2: Bid Item 50 states (60) SQFT of rock stain but on plan page 11, it states 60 SQYD. Can you clarify which is it.
Inquiry submitted 02/09/2022

Response #1:Submitted for consideration.
Response posted 02/10/2022


Response #2:Refer to Addendum No. 2, dated February 10, 2022.
Response posted 02/11/2022




Inquiry #3: What color is the colored concrete for the barrier slab
Inquiry submitted 02/14/2022

Response #1:Submitted for consideration.
Response posted 02/14/2022


Response #2:The bid opening date is today and Per Contract Plan sheets 69 - General Plan, Plan Sheet 71 - Wall Details No. 1 curb the concrete curb and concrete end blocks at each end of the bridge railing are included as part of Pay Item 56 California ST-75 Bridge Rails (Modified) and concrete barrier slab is included in Pay Item 40 Structural Concrete Barrier Slab and will be integral colored concrete for each of those items and coloring via integral concrete is paid under those respective items. Please bid accordingly.
Response posted 02/15/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.