Inquiry #1: Project plans call for for remove unsound concrete and repair with rapid setting concrete patch are indicated at Elmo Hwy OC, Mendocino OC, Route 166/5 separation, Chinworth St OC, Demaree St. OC, and Conyer St. OC; however quantities of these items are not indicated on the plans and the total quantity for Bid Item's (item 22 and 25) are correct for the other structures where the quantities are indicated. This could cause a undetermined over-run in these bid items, Please issue a new item list with these quantities added to the bid quantities.
Inquiry submitted 02/27/2019

Response #1:Submitted for consideration.
Response posted 02/28/2019


Response #2:Bid per current contract documents.
Response posted 03/06/2019




Inquiry #2: There does not seem to be a traffic control chart for Location 14, Bridge 46-0242F, W198-N99 Connector (Plaza) OH. Please advise.
Inquiry submitted 03/04/2019

Response #1:Please refer to Chart No. I2 on page 15 of the contract documents.
Response posted 03/04/2019




Inquiry #3: Page 25 of the Specs states, "For Road 68, Br. NO 46-0265, remove debris as shown. Complete debris removal before starting preparing concrete deck surface work." Per the plans for this location there is no detail or quantity for any preparation of concrete deck surface work. Please advise as to what work is to be done at this location other than remove and dispose of debris and soil along the barriers.
Inquiry submitted 03/04/2019

Response #1:Bid per current contract documents.
Response posted 03/06/2019




Inquiry #4: When removing the spalled areas on Bridge 46-0150 L/R is there a containment plan that was not included within the spec for the work that will be done between Lanes 1 and 2?
Inquiry submitted 03/05/2019

Response #1:Bid per current contract documents.
Response posted 03/06/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.