Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 06-0V2804

Submit new inquiry for this project


Inquiry #1: For the HMA on this project, can the aggregate lime treatment be replaced with an acceptable liquid anti-strip?
Inquiry submitted 01/17/2022

Response #1:Submitted for consideration.
Response posted 01/18/2022


Response #2:No, Please bid per current contract documents.
Response posted 01/20/2022




Inquiry #2: Project Files: Will Caltrans provide data or CAD files for existing grade to assist with the Bidders Takeoff? Caltrans has provided an existing ground .XML file on previous bids.
Inquiry submitted 01/18/2022

Response #1:Submitted for consideration.
Response posted 01/18/2022


Response #2:Refer to Addendum No. 1, dated January 28, 2022.
Response posted 01/28/2022




Inquiry #3: Will Caltrans please provide an existing ground topo? There is no existing contours on the grading plans and the XML file provided only provides a combined surface with existing ground only to the C/F lines on the layout sheets.
Inquiry submitted 01/18/2022

Response #1:Submitted for consideration.
Response posted 01/18/2022


Response #2:Refer to Addendum No. 1, dated January 28, 2022.
Response posted 01/28/2022




Inquiry #4: In regards to bid items 50 and 51- The quantities call for the installation of chain link fence and barbed wire fence within the same stationing. Please review and clarify which fence is to be installed.
Inquiry submitted 01/26/2022

Response #1:Submitted for consideration.
Response posted 01/27/2022


Response #2:Please refer to Note 4 on layout plan sheet 2. Barbed wire is on top of the chain linked fence. Please bid according to the contract plans.
Response posted 01/28/2022




Inquiry #5: Layout sheets L-1 note 3, L-2 note 4, and L-2 note 2 state that temporary fencing is used during construction. There is no item for temporary fence or a reference in the special provisions for this. Please review and clarify.
Inquiry submitted 01/26/2022

Response #1:Submitted for consideration.
Response posted 01/27/2022


Response #2:Fence needs to be replace by Chain link fence not temporary fence. Per Section 9-1.03 PAYMENT SCOPE of Caltrans Standard specifications 2018: “Payment is: Full compensation for all work involved in each bid item shown on the Bid item list by the unit of measure shown for that bid item”. In this case, payment is included in the Bid item 51, CHAIN LINK FENCE (TYPE CL-6).
Response posted 01/28/2022




Inquiry #6: Layout sheets L2, L3, L4 line "SE LIP" call for removal of fence but have no callout for the installation of new fence to match the summary of quantities. Please review and clarify.
Inquiry submitted 01/27/2022

Response #1:Submitted for consideration.
Response posted 01/27/2022


Response #2:Fence needs to be replace by Chain link fence not temporary fence. Per Section 9-1.03 PAYMENT SCOPE of Caltrans Standard specifications 2018: “Payment is: Full compensation for all work involved in each bid item shown on the Bid item list by the unit of measure shown for that bid item”. In this case, payment is included in the Bid item 51, CHAIN LINK FENCE (TYPE CL-6).
Response posted 01/28/2022


Response #3:
Response posted 01/28/2022




Inquiry #7: According to the traffic and CAS plans CalTrans is building this project under a full closure for the duration of the project. What is the need for Temporary Lighting (Bid Item #72) in the construction zone under a complete closure? Please review.
Inquiry submitted 01/28/2022

Response #1:Submitted for consideration.

Response posted 01/28/2022


Response #2:Some construction activities are outside of the full closure are and for those construction activities temporary lighting at the roundabout is required.
Response posted 01/31/2022




Inquiry #8: Based on Response #2 to bid inquiry #4, are we to assume that bid item #50- Fence (Type BW, 5-Strand, Metal post) is not being used and barbed wire on top of the chain link will be a part of bid item #51-Chain link fence?
Inquiry submitted 01/31/2022

Response #1:Submitted for consideration.
Response posted 01/31/2022


Response #2:Yes, Barbed wire is to be installed on top of chain link fence.
Response posted 02/01/2022




Inquiry #9: What's the duration for this job? Please confirm it is 50WD.
Inquiry submitted 02/04/2022

Response #1:Submitted for consideration.
Response posted 02/04/2022


Response #2:Bid per current contract documents.
Response posted 02/07/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.