Inquiry #1: On Sheet E-11, note [13] points at the traffic signal controller.
There is no note [13] on sheet E-10 which describes the note.
What does note [13] mean or reference?

Inquiry submitted 09/19/2020

Response #1:Submitted for consideration.
Response posted 09/21/2020


Response #2:Please disregard Box Note 13 on sheet E-11. It is not applicable to the current contract documents.
Response posted 09/25/2020


Response #3:Please disregard Box Note 13 on sheet E-11. It is not applicable to the current contract documents.
Response posted 09/25/2020




Inquiry #2: Will Caltrans accept SS1H for fog sealing of the Ground-In Rumble cuts? The current specifications do not specify a required type of fog seal.
Inquiry submitted 09/21/2020

Response #1:Submitted for consideration.
Response posted 09/21/2020


Response #2:Bid per the current contract documents and Standard Specification Section 37-4.02B.
Response posted 09/23/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.