Bidder Inquiries
Caltrans Bidding Connect Account:
Sign In (Sign in is required to access Project Plans)
Create Account (Click here to create a Caltrans Bidding Connect Account)
Viewing inquiries for 06-0X0404
Submit new inquiry for this projectInquiry #1: On Sheet E-11, note [13] points at the traffic signal controller.
There is no note [13] on sheet E-10 which describes the note.
What does note [13] mean or reference?
Inquiry submitted 09/19/2020
Response #1:Submitted for consideration.
Response posted 09/21/2020
Response #2:Please disregard Box Note 13 on sheet E-11. It is not applicable to the current contract documents.
Response posted 09/25/2020
Response #3:Please disregard Box Note 13 on sheet E-11. It is not applicable to the current contract documents.
Response posted 09/25/2020
Inquiry #2: Will Caltrans accept SS1H for fog sealing of the Ground-In Rumble cuts? The current specifications do not specify a required type of fog seal.
Inquiry submitted 09/21/2020
Response #1:Submitted for consideration.
Response posted 09/21/2020
Response #2:Bid per the current contract documents and Standard Specification Section 37-4.02B.
Response posted 09/23/2020
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.