Inquiry #1: For the 0.25' cold plane and subsequent 0.25' HMA placement (excluding digouts), will the state consider allowing 7 days between cold plane and HMA placement? Or at least 3 or even 1 day? It is difficult to schedule the necessary subcontractors to grind and place HMA back in the same shift as required by the standard specifications. Additionally, it increases the total duration of working days/impact to the public and substantially increases construction costs.
Inquiry submitted 02/05/2020

Response #1:Submitted for consideration.
Response posted 02/05/2020


Response #2:Bid per current contract documents.
Response posted 02/10/2020




Inquiry #2: Please re-issue the SB Hwy 33 smoothness data. The file appears to be corrupt, we are not able to retrieve any information from it. The other smoothness files are fine.
Inquiry submitted 02/06/2020

Response #1:Submitted for consideration.
Response posted 02/06/2020


Response #2:The Department confirmed that all the files were able to be downloaded successfully. Please inquire if still unable to download all files.
Response posted 02/10/2020




Inquiry #3: SB RTE 33 Smoothness Data could not be opened. All other files were able to be opened, could the State please fix.
Inquiry submitted 02/11/2020

Response #1:Your inquiry has been submitted
Response posted 02/11/2020


Response #2:File name has been corrected. Thank you for your patience.
Response posted 02/12/2020




Inquiry #4: Per Section 12-1.04 of the revised amendments Caltrans is no longer splitting the flagging costs with the contractor, correct?
Inquiry submitted 02/18/2020

Response #1:Submitted for consideration.
Response posted 02/19/2020


Response #2:Flagging costs are included on the pay item Traffic Control System as per Revised Standard Specification 12-4.02.
Response posted 02/21/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.