Inquiry #1: Will you provide detail for item #9, AWIS? Is this required for the duration of the project? Or only for certain stages or locations?

Inquiry submitted 11/16/2020

Response #1:Please refer to addendum No.1 issued on 1/4/2021.
Response posted 11/16/2020




Inquiry #2: In light of the unprecedented fires throughout California and California’s emphasis to build “resilient” infrastructure, will Caltrans follow its own High Design Manual Section 850-34 dated December 30th 2015 which warns against installing plastic pipe in areas with a potential for fire? This project lists Alternative Pipe Culvert in the Bid Schedule which includes plastic pipe as an acceptable product.
Inquiry submitted 12/03/2020

Response #1:plastic is still an acceptable item for this project. This project is not located in fire-prone areas of concern.
Response posted 12/03/2020




Inquiry #3: How many working days is plant establishment?
Inquiry submitted 12/29/2020

Response #1:
Response posted 12/30/2020


Response #2:Please refer to addendum No.1 issued on 1/4/2021.
Response posted 01/04/2021




Inquiry #4: Item 52 Hydromulch and Item 53 Hydroseed listed on the bid schedule but no information listed on the planting plans in regards to where it will be applied or what is being requested as materials for these items. Please advise.
Inquiry submitted 12/31/2020

Response #1:The bidder confused this project with another project. We do not have items in this project.
Response posted 01/04/2021




Inquiry #5: Will you provide detail for item #9, AWIS? There is nothing listed in the plans or the special provisions. Is this required for the duration of the project, or only for certain stages or locations?
Inquiry submitted 01/05/2021

Response #1:Please refer to addendum No.1 issued on 1/4/2021.
Response posted 01/05/2021




Inquiry #6: Section 39 special provisions calls to add to section 39-2.03(3)(a) "The grade of asphalt binder for RHMA-G must be PG64-10". I do not see a bid item for RHMA-G? If there is rubber on the project, will this require PG64-10?
Inquiry submitted 01/06/2021

Response #1:Only asphalt HMA Type A is required in this project, pay items 71 through 75 only type A is used.
Response posted 01/07/2021


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.