Inquiry #1: Drainage Quantities DQ-1 shows 184.5 CY of class 3 permeable material, but this quantity is not added to Bid item No. 29 Class 3 aggregate base.
Inquiry submitted 08/06/2019

Response #1:Item 29 and Item 35 are not combined. Both are separate items to be bid independently.
Response posted 08/07/2019




Inquiry #2: Summary of Quantities Q-1 shows 1,660.4 CY of roadway excavation at Sheet L-10, Location 20, but this location has 2,246.1 SF of rock blanket only. Please verify the roadway excavation quantity.
Inquiry submitted 08/06/2019

Response #1:The roadway excavation is correct. There is an existing dirt area at the gore to be excavated before rock blanket is placed there. Bid on item 21 as is.
Response posted 08/07/2019




Inquiry #3: Bid Item No. 21 Roadway Excavation has 2,040 CY of dirt. Can we spread this dirt on site or should we haul out to a off-site disposal area?
Inquiry submitted 08/16/2019

Response #1:Spread out if you have space within state right of way. If there is no space to spread out, the contractor is owner of such material.
Response posted 08/16/2019




Inquiry #4: Rock blanket detail on Construction Details C-3 shows 6" depth. What will be the pay item for this 6" excavation? Is this under Bid Item 23 Rock Blanket or Bid Item 21 Roadway Excavation?
Inquiry submitted 08/23/2019

Response #1:The excavation for Rock Blanket is included in Item 23 Rock Blanket.
Response posted 08/26/2019




Inquiry #5: Plan DQ-1 Drainage Quantities shows 369 CY of excavation for DPP Infiltration Area. Is this excavation quantity to be paid under Item 21 Roadway Excavation?
Inquiry submitted 08/28/2019

Response #1:Yes, the excavation for the DPPIA is included in Item 21.
Response posted 08/28/2019




Inquiry #6: Rock blanket detail on Construction Details C-3 shows 6" excavation. Should we haul out the excavated material to off-site?
Inquiry submitted 09/03/2019

Response #1:Excavated Material classified as ADL (Type Z-2) needs to be disposed off site per Special Provisions.
Response posted 09/04/2019




Inquiry #7: Insurance requirements could not be located in the specs. Please advise if they will be provided.

What are the liquidated damages?

Inquiry submitted 09/05/2019

Response #1:The Liquidated damages Amount is shown on Section 8-1.10 of the 2018 Standard Specifications.
Response posted 09/06/2019




Inquiry #8: I had previously submitted question #7 regarding insurance requirements and liquidated damages but only one was answered.

Insurance requirements could not be located in the specs. Please advise if they will be provided or where they can be located. Thank you.

Inquiry submitted 09/09/2019

Response #1:Please refer to Section 7, “Legal Relations and Responsibility to the Public,” of the 2018 Standard Specifications.
Response posted 09/09/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.