Inquiry #1: Irrigation Sprinkler Schedule ISS-1 calls for 4" high riser and 12" tree well drainage length for tree well sprinkler. However, revised standard plan RSP H4 shows the riser height and drainage length about the same. Please clarify.
Inquiry submitted 01/11/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/12/2022


Response #2:Please refer to RSP H4.
Response posted 01/31/2022




Inquiry #2: Please confirm how many working days for Permanent Erosion Control Establishment work.
Inquiry submitted 01/13/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/14/2022


Response #2:215 Working Days
Response posted 01/24/2022




Inquiry #3: There are four proposed drain inlets, but they are not protected by K-rails. Please extend the K-rails to the proposed inlets since they are in the roadways.
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/18/2022


Response #2:Please refer to addendum No. 3. dated January 27, 2022.
Response posted 01/31/2022




Inquiry #4: It is found that there are a couple of feet of wood mulch existing in the DPPI areas. Which bid item should cover the wood mulch removal? Should the existing mulch be exported or could be spread on site?
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/18/2022


Response #2:Any material to be removed within the DPPIA cross section (including wood mulch) is included in the cost for the DPPIA bid item. Wood mulch may be spread on site
Response posted 01/24/2022




Inquiry #5: There is no detail for the tapered inlet at Location 7. Is the drainage inlet at Location 10 precast?
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/18/2022


Response #2:Location 7. Refer Caltrans Std Detail D87D.
Location 10. It is Caltrans Standard G2 Inlet - Precast.

Response posted 01/24/2022




Inquiry #6: Drainage Detail DD-1 Section A-A shows DPPIA width and width per plan for rock basin. However, plans do not show the width for rock basin. Please show the width for rock basin.
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/19/2022


Response #2:Width of rock basin is same as width of BMP.
Response posted 01/24/2022




Inquiry #7: Drainage Quantities DQ-3 has 5.30 tons of hot mix asphalt and Pavement Structure Quantities on Summary of Quantities Q-1 has 149.7 tons of hot mix asphalt. However, bid item 69 hot mix asphalt is only 150 ton.
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/19/2022


Response #2:Use Hot Mix Asphalt Quantity 155 tons.
Response posted 01/24/2022




Inquiry #8: Typical Cross Sections X-1 shows HMA dike type E at Location 1, 3 and 7. However, Summary of Quantities shows Type D at HMA Dike Quantities.
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/19/2022


Response #2:Use Type E at HMA Dike Quantities.
Response posted 01/24/2022




Inquiry #9: Drainage Quantities DQ-1 description has "abandon monitoring well" for Remove drainage facility, but there is no detail or specification.
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/19/2022


Response #2:The existing well shall not be removed/abandoned. Refer Sheet D-2
Response posted 01/24/2022




Inquiry #10: Bid item 30 Roadway Excavation has 4,280 CY. Should the excavated soil be exported or spread on site?
Inquiry submitted 01/18/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/19/2022


Response #2:If the soil is clean, and grading allows per plans, excavated soil can be used onsite otherwise export offsite.
Response posted 01/24/2022




Inquiry #11: Maintenance Vehicles Pullouts need 1.7' excavation. Is this going to be paid under the Bid Item 30 Roadway Excavation?
Inquiry submitted 01/19/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/20/2022


Response #2:Yes. This item will be paid under Bid Item 30 - Roadway Excavation.
Response posted 01/24/2022




Inquiry #12: Please confirm the areas for which a temporary irrigation system is required.

Please also confirm the length of time that the temporary system is to be operated. For the duration of the plant establishment period? For the duration of the permanent erosion control established period?

Inquiry submitted 01/20/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/20/2022


Response #2:Temporary irrigation systems are required at the mitigation planting sites shown on Sheet PP-2 and at Location 5 shown on PP-3.The temporary irrigation is to be provided for the duration of the plant establishment period.
Response posted 01/24/2022




Inquiry #13: What is the depth of infiltration trench on Section A-A of Drainage Plan D-11?
Inquiry submitted 01/20/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/20/2022


Response #2:It is 10'. Refer Sheet DP-7
Response posted 01/24/2022




Inquiry #14: There are three HMA overside drains. Which bid item should they be paid under? The quantity of Bid item 69 Hot Mix Asphalt does not include the overside drains.
Inquiry submitted 01/21/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/24/2022


Response #2:Use Hot Mix Asphalt (Type A)
Response posted 01/31/2022




Inquiry #15: please provide profiles or details for the drainage inlets
Inquiry submitted 01/21/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/24/2022


Response #2:It is Caltrans Standard G2 Inlet - Precast. Use min 36" depth from RIM, with min cover of 30" over storm drain at the discharge side, and daylighting on rip rap.
Response posted 01/31/2022




Inquiry #16: what grates are being used for the drainage inlets?
Inquiry submitted 01/21/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/24/2022


Response #2:It is Caltrans Standard G2 Inlet - Precast. Refer Std Dtl D72B
Response posted 01/31/2022




Inquiry #17: what is the thickness of the concrete pad at location 3? Is there any rebar or wire mesh in the concrete pad?
Inquiry submitted 01/21/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/24/2022


Response #2:Use 4" Thick Concrete Pad with #3 bars @12"OC EW
Response posted 01/31/2022




Inquiry #18: Please clarify for the drainage basins, i.e. DP-1, which bid item is intended to pay for removal of the original ground to top of the finished surface of the basin?
Inquiry submitted 01/24/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/24/2022


Response #2:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/24/2022


Response #3:Excavation of the BMP from the top of the BMP to the excavation depth is included in the DPPIA cost and quantified on the DQ sheets. Any excavation from the existing surface to the top of the BMP is per Caltrans std plan A62A and is paid for under ditch excavation or roadway excavation and is quantified on the Q sheets.
Response posted 01/31/2022




Inquiry #19: Per Inquiry #5, the tapered inlet at Location 7 is to be built per Caltrans Std Detail D87D. There does not appear to be any concrete in this detail, per the drainage quantities sheet the tapered inlet has 0.83 CY of concrete. Please confirm if this is correct. Also should the tapered inlet be paid under a tapered inlet item rather than the structural concrete, drainage inlet item?
Inquiry submitted 01/25/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/25/2022


Response #2:Please bid per contract documents.
Response posted 01/31/2022




Inquiry #20: What are the heights of the precast G2 drainage inlets?


Inquiry submitted 01/25/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/25/2022


Response #2:Please refer to Bidder's Inquiry #15
Response posted 01/31/2022




Inquiry #21: Please confirm whether excavation/removal of existing material necessary for installation of Aggregate Topsoil (Bid Item 75) is paid for as part of the same bid item or as part of the Roadway Excavation bid items (#30 and/or #31).
Inquiry submitted 01/25/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/25/2022


Response #2:The excavation/removal will be part of Roadway Excavation Bid Items.
Response posted 01/31/2022




Inquiry #22: Will the Contractor be responsible to pick up trash along the project limits while under contract with State?

In work location where there is already significant trash, in what bid item will cleaning up this trash be paid?

Inquiry submitted 01/26/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/26/2022


Response #2:
A) Refer to Standard Specifications: 5-1.31, Section 13, 14-10.01, 17-2.03B Clearing, 21-2.03A, 21-2.03P

B) Item 29 CLEARING AND GRUBBING within construction areas above original ground.

Response posted 01/31/2022




Inquiry #23: Will the Contractor be responsible to pick up trash along the project limits while under contract with State?

In work location where there is already significant trash, in what bid item will cleaning up this trash be paid?

Inquiry submitted 01/26/2022

Response #1:Please refer to Bidder's Inquiry #22
Response posted 01/26/2022




Inquiry #24: Regarding Inquiry #8, Summary of Quantities shows Type D at HMA Dike Quantities. Please clarify whether Type D 6" high AC dike or Type E 4" high AC dike to be used.
Inquiry submitted 01/29/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/31/2022


Response #2:For the type of dike to be used for this portion of HMA, please refer to the layouts, construction details.
Response posted 01/31/2022




Inquiry #25: Drainage Quantities DQ-1, 2, and 3 show 2,378 CY total of soil amendment for Bid item 76 DPP INFILTRATION AREA (GRAVEL). Is this soil amendment different from the soil amendment used for planting?

Inquiry submitted 01/29/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/31/2022


Response #2:For Soil Amendment in DPP Infiltration Areas, please refer to Special Provision 62-2.02I.
Response posted 01/31/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.