Viewing inquiries for 07-323904

Submit new inquiry for this project


Inquiry #1: What is the depth and minimum width of the Replace AC Surfacing work.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/08/2022


Response #2:
For depth see typical pavement sections on typical cross section X-1 and construction detail sheets C-2 thru C-4.

For width see typical cross sections X-1 thru X-7, layout plans L-1 thru L-27 and construction detail C-2 thru C-4.

Response posted 12/13/2022




Inquiry #2: Is the quantity for item 19 correct? 430 tons asphalt emulsion fog seal.
Inquiry submitted 12/15/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/15/2022


Response #2:Yes.
Response posted 12/16/2022




Inquiry #3: Please describe the work to be performed under bid item 390025 SEGMENT CORRECTION.
Inquiry submitted 12/20/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/20/2022


Response #2:It is to indicate the number of dig out locations needing segment correction that are shown on Q-1, Summary of Quantities, sheet 155 of 226 of the contract plans.
Response posted 12/30/2022




Inquiry #4: We see that there is a Type A HMA listed but we did not see where it is to be used in the plans. Would you please clarify?
Inquiry submitted 12/28/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/30/2022


Response #2:It is for the Asphalt Dike (Type C) called out on layout plans L-1 and L-2. The quantity is shown on summary of quantities, Q-2.
Response posted 01/03/2023




Inquiry #5: Regarding question and answer #3: please describe the actual work to be performed, not the quantity. Special provisions section 39-2.01C(3)(e)(i) "applies to existing asphalt concrete surfaces".

Are we to grind the existing asphalt prior to performing the digout? What are the dimensions for the grinding area? Only the area we are digging out?

Inquiry submitted 01/03/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/03/2023


Response #2:
As in the posted response answer to Q#3, it is to indicate the number of digout locations needing segment correction in the direction of the travelled way based on the pavement profile smoothness data information handout provided for project bid. The actual work is the digout segment correction that need to be done before paving. And yes 39-2.01c(3)(e)(i) does apply to existing asphalt concrete surface.

Based on the pavement profile smoothness data information handout provided for project bid and field site investigation you should be able to determine whether digouts are warranted or not incorporation with the Resident Engineer as indicated on the contract plans.
Response posted 01/04/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.