Inquiry #1: Please advise if there will be a scheduled pre-bid conference and/or site visit for project 07-325704.
Inquiry submitted 11/08/2018

Response #1:There is no scheduled pre-bid conference and/or site visit for this contract.
Response posted 11/09/2018




Inquiry #2: In light of the recent fires and continuing drought will Caltrans allow plastic pipe for Alternative Pipe Culvert.
Inquiry submitted 11/16/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/16/2018




Inquiry #3: Is there any "Self Performance" requirement on this project ?.
Inquiry submitted 12/05/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/05/2018




Inquiry #4: Please advise if an insulated fiberglass translucent sandwich panel system (as manufactured by Kalwall Corp.) is an acceptable product for the translucent roof panels/skylights shown on the equipment repair shop roof plan, per A1-07. There is no specification provided. Thank you in advance.
Inquiry submitted 12/06/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/06/2018




Inquiry #5: Please confirm bids are to be submitted electronically through Bid Express. Notice to Bidders states both sealed envelopes to Santa Fe Springs location and electronic bids will be acceptable.
Inquiry submitted 12/06/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/06/2018




Inquiry #6: Please confirm electronic submittals will be acceptable in lieu of hard copies.
Inquiry submitted 12/06/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/06/2018




Inquiry #7: Good morning,

1.Is there any "pre-qualification" on this project?.
2.Is there any "Self Performance" required?.
Thank you.

Inquiry submitted 12/07/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2018




Inquiry #8: What are the minority goals and/or requirements specific to this project?
Inquiry submitted 12/10/2018

Response #1:As noted on the Notice to Bidders: The Department establishes no DVBE Contract goal for this contract but encourages bidders to obtain DVBE
participation.
Response posted 12/10/2018




Inquiry #9: Are there any commissioning requirements required on this project?
Inquiry submitted 12/11/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/14/2018




Inquiry #10: Per Section 80 - Security Metal Fences and Gates, we are required to submit a manufacturer's standard 10-year warranty for factory finish. Can you please give us a list of your approved manufacturer for the said Security Metal Fences and Gates. Thanks
Inquiry submitted 12/12/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/14/2018




Inquiry #11: Please confirm the liquidated damages on this specific project. The standard specs don't appear to be for projects in this capacity.
Inquiry submitted 12/14/2018

Response #1:The Liquidated Damages for all projects can be found in Section 8-1.10, "Liquidated Damages," of the 2015 Standard Specifications.
Response posted 12/14/2018




Inquiry #12: Please extend the bid due date by a week or so, from 01/08/19 to 01/18/19 if possible, considering the holiday breaks that our staff and subs will be taking, starting the coming Christmas week. Thanks for the consideration.
Inquiry submitted 12/18/2018

Response #1:The project will bid on 02/14/19.
Response posted 12/20/2018




Inquiry #13: Irrigation Clarification: Currently on plans IP-1 & IP-2 there are symbols, but no reference to what they represent. It is the curvy line with ACC in it. Please clarify what they represent. Thank you.
Inquiry submitted 12/19/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/20/2018




Inquiry #14: Irrigation Clarification: Currently on plans IP-1 & IP-2 there are symbols, but no reference to what they represent. It is the curvy line with ACC in it. Please clarify what they represent. Thank you.
Inquiry submitted 12/20/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/20/2018




Inquiry #15: As a result of the holiday schedule, we respectfully request a bid date extension.
Inquiry submitted 12/20/2018

Response #1:The project will Bid on 02/14/19.
Response posted 12/20/2018




Inquiry #16: 1/ SUBSURFACE UNDERDRAIN AND PLANTER QUANTITIES on sheet Q-2 in addendum 1 shows 345 cubic yards of class 2 permeable material with a note For information only, not a separate pay item. So, please advise which item is class 2 permeable material paid under?

2/ On sheet PP-2, there are (3) symbols in the middle of the planter at VA1 LINE 75+00 without being called out. Please advise they are trees or shrubs? New or existing?

Inquiry submitted 12/20/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #17: The action required to obtain a bid proposal forms is a bit complicated. We are currently attempting to obtain our Bidder ID number from the State and two different websites used by the DOT (Bid Express and Expedite Bid). As far as we can tell the Bid Express hosts the actual bid proposal to download/print and then we actually submit it through Expedite Bid. The process appears a bit more arduous as a result of the DOTs transition to Bid Express occurring concurrently with the bid process for this project.

Our question is, without currently being able to view the bid proposal forms for reasons noted above, we would like to confirm that the subcontractor listing form and any and all other required forms required to submit electronically will be provided by the State with the exception of the bid bond which we use our Suretys standard form for.

Inquiry submitted 12/21/2018

Response #1:There is no problem with this project and all the forms are available. You need to establish a digital ID.
Response posted 12/21/2018




Inquiry #18: The following drawings were found in the plans but not on the sheet index (drawing GI-1B): M2-08, EE1-4.3 and EE1-4.4. Please clarify if these drawings apply to the project.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #19: Please clarify where spec section 99-08341 Overhead Coiling Grille applies to this project. The door schedule on A1-28 shows overhead coiling doors and sectional overhead doors but no overhead coiling grille is shown.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #20: Please clarify where spec section 99-10443 Metal Signs and spec section 99-10445 Signs applies to this project. Drawing A0-3.3 lists all the different sign types but the only sign shown on any other drawing is on 013/A1-24.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #21: Please clarify where spec section 99-10411 Information Display Cases applies to this project.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #22: Please clarify where spec section 99-02372 Cast-in-Drilled Hole Concrete Piles applies to this project.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #23: Please clarify where spec section 99-12522 Audio Visual Venetian Blinds applies to this project.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #24: Bid Item #72 Detectable Warning Surface only indicates a total of 12 square feet. Drawing GP has three separate parking areas and the details for each area(1/A03.1, 1/A0-4.2, 2/A0-4.2) show substantially more that 12 square feet of detectable warning surface. Please clarify.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #25: The following shrubs and trees do not have any indication in the plans or specs for required sizes: Ceanothus Griseus Horizonalis Point Reyes, Lantana Montevidensis Patriot Rainbow, Salvia Leucantha Mexican Bush Sage, Muhlenbergia Capillaris Pink Muhly, Cercidium Desert Museum Palo Verde, Cercis Occidentalis Western Redbud, Rhus Lanceolata Prarie Sumac. Please advise.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #26: The plans and specifications provide no brand/model specifications for the following landscaping items: root barrier, 1 remote control valve, 1 remove control valve, 3 remote control valve, 1 wye strainer assembly, 2 wye strainer assembly, 12 station irrigation controller (wall mount), irrigation controller enclosure cabinet, 2 backflow preventer assembly, flow sensor, tree well sprinkler assembly, riser sprinkler assembly, quick coupler valve, ball valve, fiber roll, 3 gate valve.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #27: Per Addendum 1 the completion date for all work excluding plant establishment is to occur within 70 working days. This duration appears to be too short for the project scope. Please review and confirm the duration.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #28: As it relates to Standard Specifications section 5-1.13A, please confirm that this contract is considered Building Construction non-federal-aid and therefore the self-performance of at least 30% is NOT required.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #29: Please clarify what unit price line item is to be used to dispose of earth material.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #30: On the door schedule the following doors (2, 3, 5, 6, 8, 22, 23, 24, 25, 26, 27, 28, 29, 37, 39) are all door type B and are shown to have a 5 - 0 width. As door type B is shown as a single door with a sidelight, is the door 3 0 wide and the sidelight 2 0 wide?
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #31: What spec section is responsible for wood door 87?
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #32: On floor plan page A1-01, there is a window mark L at the west side of room 048 (Lube/Compressor Room). Per the Window Schedule A1-29, there is no window type L.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #33: The following shrubs and trees do not have any indication in the plans or specs for required sizes: Ceanothus Griseus Horizonalis Point Reyes, Lantana Montevidensis Patriot Rainbow, Salvia Leucantha Mexican Bush Sage, Muhlenbergia Capillaris Pink Muhly, Cercidium Desert Museum Palo Verde, Cercis Occidentalis Western Redbud, Rhus Lanceolata Prarie Sumac. Please advise.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #34: There might be some redundancy between Item #99 specs/scope and Item #s 57, 72, 79, 82, 88, 89 specs/scope. Please clarify, for example item #57 Item Code 260303 vs. Section 99-02234; Item #82 Item Code 780500 vs. Section 99-02844, etc.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #35: Please clarify where spec section 99-02072 - Relocating Materials and Equipment applies to the project.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #36: On the bid item list, please clarify what the symbol (F) next to item numbers 19, 20, 44 50, 62, 63, and 80 signifies.
Inquiry submitted 12/21/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/21/2018




Inquiry #37: Will you be releasing CAD's for this contract?
Inquiry submitted 12/21/2018

Response #1:NO.
Response posted 12/21/2018


Response #2:NO.
Response posted 12/21/2018


Response #3:NO.
Response posted 12/21/2018




Inquiry #38: Addendum 1 revised controller item to 12 station irrigation controller (pedestal mounted), but reference to Special Provisions, under Add to section 20-2.06B(2)(a), page 14, price of 36-station wall mount controller is provided. Please revise the model of controller & its price accordingly.
Inquiry submitted 12/26/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/27/2018




Inquiry #39: Under Add to section 20-2.06B(2)(a), page 14, model of controller is indicated as CA16-WT3-12. This is 36-station controller as shown? Please confirm.
Inquiry submitted 12/26/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/27/2018




Inquiry #40: Reference to Special Provisions, page 14, the specs require to Delete item 2 in the list in the 1st paragraph of section 20-2.02B(1), but then show to Add to section 20-2.02B(3). Please advise backflow preventer blanket is required in this project or not.
Inquiry submitted 12/26/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/27/2018




Inquiry #41: Section 850-34 of the CA Highway Design manual dated December 30th, 2015 warns against specifying plastic pipe in locations with a risk of fire. Will Caltrans allow for plastic pipe to be used on this project?
Inquiry submitted 12/27/2018

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/27/2018




Inquiry #42: section 99-11146b(3) seems to indicate a dual reciprocating style compressor but the drawings lead to a base mounted rotary screw unit with separate tank and dyer, can you confirm what style of unit is to be provided?
Inquiry submitted 01/04/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/07/2019




Inquiry #43: On the metal soffit panels shown on Sheet A1-23, there are no details on how the panels are to be mounted. Please provide details for mounting. Also, please provide a hole pattern for the ceiling soffit panels.
Inquiry submitted 01/07/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/07/2019




Inquiry #44: After reviewing and performing a takeoff for the landscaping, a discrepancy was found among the bid form quantities and what is shown on the plans, in particular, the following items were way off in quantities:

Bid item #26 Plant Group A shows a quantity of 410. Our takeoff has revealed a quantity of 294.
Bid item #27 Plant Group U shows a quantity of 29. Our takeoff has revealed a quantity of 44.

Inquiry submitted 01/07/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/07/2019




Inquiry #45: Are bridge cranes top running or under running? Spec paragraph 99-14635A(3) indicates top running but drawing A1-14 shows under running. Please clarify.
Inquiry submitted 01/07/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/07/2019




Inquiry #46: Please provide a topographic map or grading plan for this project.
Inquiry submitted 01/09/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/09/2019




Inquiry #47: Spec Section 99-09957 Acoustical Ceiling Tile calls out for a 12 x 12 x 5/8 square edge tile with a latex finish. This tile does not conform with the 2ft x 4ft ceiling tile shown in the RCP. Please provide a preferred acoustical ceiling tile and suspension system.
Inquiry submitted 01/09/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/09/2019




Inquiry #48: Please confirm that it is allowed to use the Umbrella limits to satisfy the General Liability limit requirements.
Inquiry submitted 01/11/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/11/2019




Inquiry #49: The compressed air reels have no specifications as to pressure, length and ID. Please advise
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #50: The compressed grease Graco reel model number is given as HSM62B. This is for oils and has a lower pressure rating. The correct model for grease is the HSH55B, 3/8" ID, 50' length, 4,800-lb Max. pressure. Please confirm if this is what you want.
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #51: Drawing M2-01; what type of connection do you want for the air drops - quick coupling size - and what are the reel requirements?
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #52: Section 99-11146B(1); Metering valves. There is no specification for the HO meter. Also, is there more information available for the ATF meter?
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #53: Drawings A3-01 through 08, Storage; is any shelving required for this building?
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #54: 99-11146B(2), pump assemblies, motor oil pumps; please clarify what is meant by "air expeller".

Anti-freeze pump; the specified Graco model 225852 is an oil pump. We respectfully suggest specifying the Graco model 647017 pump, a Husky model 1050 included in the Graco model 244680 coolant dispensing pump package.

Waste oil transfer pump - also Drawing M2-01; A suction reel is shown on the waste oil pump evac system, and a suction wand assembly for the waste coolant evac system. Since suction lift is not strong on a diaphragm pump we respectfully suggest taking these features out and specifying a set of Graco Oil King (238866) and Coolant King (248632) receivers for both repair bay wings, which are designed to efficiently work with the evac system without reels or suction wands, and are much cleaner.

Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #55: Section 99-11146B(3), compressor; the description could apply to a 25-hp duplex compressor (2-stage), or a 50-hp rotary screw compressor. Please clarify.

Also, what CFM and PSI is required.

Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #56: Section 99-11146B(3), light reel; do you want an outlet along with the light, or will it be a light only?
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #57: 99-14451B(1), Mobile Column Lifts; the specification calls for wireless operation and a cord reel. Please clarify that both are required.


Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #58: 99-14451B(1), Wheel adapters; How many sets do you want?
Inquiry submitted 01/15/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #59: In regards to the oil tanks, Any specific shape or dimensions for the oil tanks ? What ratio oil pumps do they need? What type of meter are needed for the oil product – preset – manual or digital? Permits for the oil tanks – who is in charge or is this part of the bid ?
Inquiry submitted 01/16/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #60: In regards to the hose reel. What length of hose for each reels? Any specific brand of reel? What kind of brackets or post are available to install the reel? Who is supplying the reel bracket?
Inquiry submitted 01/16/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #61: 99-14451B(1), lifts; Will seismic design for anchoring and anchor pads be provided by the Engineer of Record, or do you want thisto be provided by the lift supplier/installer?
Inquiry submitted 01/16/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #62: Drawings M1-04 and M2-04, detail 1, Fume Exhaust Removal; Do you have a preferred make, model and performance requirements for each type? We respectfully suggest the Airflow model PCH-1 for the mobile units, and the Airflow EZ-Arm extractor arm for the stationary system in detail 1.
Inquiry submitted 01/16/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #63: Panel Schedules, drawings EE1-2.7, 6.2, 6.3, 6.5; The following equipment is listed on the panel schedules, but not specified:
Drill presses, pedestal grinders, parts cleaners, surface grinder, hydraulic hose crimper, hydraulic hose cut-off, blast cabinet, hydraulic press, hot parts washer.
Are these to be provided with the contract? If they are, are there specifications?
If they are owner furnished or existing, will they be contractor-installed?

Inquiry submitted 01/16/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #64: Drawing M2-03, refrigerated air dryer, filtration; We respectfully recommend adding a coalescing filter to the air filter after the compressor to protect the dryer.
Inquiry submitted 01/16/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/16/2019




Inquiry #65: Please clarify if wood curbs are required at translucent roof panels and mechanical equipment.
Inquiry submitted 01/30/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/30/2019




Inquiry #66: Regarding the Vehicle Exhaust removal systems, please Confirm:
All hose reels are Motorized; VEHR Systems incorporate automatic controls on the hose reels to activate the fan; VEHR Systems are “all on” or “all off”; VEHR Systems incorporate automatic controls where the fan will be “first on / last off” when the hose reels are extended and then retracted; VERF Hose Reels incorporate controls to automatically turn the fan on and off.

Inquiry submitted 01/30/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/30/2019




Inquiry #67: Considering the large number of unanswered questions dating back to November the bid date needs to be adjusted. Many of these questions must be answered far enough in advance of bid date to accurately adjust our bid to the answers. Please answer these questions and push the bid date.


Inquiry submitted 02/03/2019

Response #1:Per Addendum No. 3 issued on February 8, 2019, the advertisement of this Contract 07-138204 has been cancelled.
Response posted 02/04/2019




Inquiry #68: Please answer question #27 regarding addendum 1 which requires the project be built in 70 WD's. We assume this was a mistake as this project can not be built in this short duration. Please answer the question, then push the bid date to allow adequate time for our bid schedule development.
Inquiry submitted 02/03/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/04/2019




Inquiry #69: On sheet M0-00 it is showing a 8” and 6” fire line into the building. Is this a typo or are there 2 lines?
Does the domestic water feed off the 8” fire line that we bring across the street? Or will install a new domestic water service?

Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #70: Is the 2” gas line private from the building to the rinse pad?
Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #71: Is HDPE pipe sufficient storm drain materia? Per sheet DQ-1 table states smooth plastic from ID in 18” and 24”?
Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #72: Will there be a Edison plan designed for the electrical install or is the install per the plan that was provided with the bid package?
Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #73: Will Brooke’s boxes be a excepted as catch basins for storm drain system?
Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #74: We cannot find any call out for the over-ex for the building or parking lot. The soils report says the footings should be placed on undisturbed native material, but also states there was an existing building that had pilons extending 20’ down and have been removed. Seems the entire sight would have been disturbed during the demo process? Please advise on the over-ex depth.
Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #75: ON sheet M0-00 of the plans, note one states the following: "Contact County of Los Angeles Sanitation Department for final connection and requirements for connecting to existing sewer." we contacted them and they told us that the existing sewer line in Freeway Dr. belongs to City of Santa Fe Springs. Can you please clarify this and will Cal Trans be paying the permit and connection fees for both agencies?
Inquiry submitted 02/06/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #76: I have a question regarding conflicting information on the drawings. Sheet A0-1a is calling for a deluge type sprinkler system. Sheet A0-1c also references a deluge type system. Riser detail on sheet M2-11 shows a traditional wet system riser. Please confirm if it is the intent of the Architect to provide this building with a deluge system.
Inquiry submitted 02/07/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #77: Just following up on my Inquiry #10. Bid date is getting closer and we still need to request from those manufacturers. Thanks
Inquiry submitted 02/07/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019


Response #2:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2019




Inquiry #78: As per sheet EE0-02 can you please clarify if only the 35' sliding gate will require a gate operator with magnetic locks. Also after reviewing the special provisions and the plan sheets there is no manufacturer listed or model # listed for the gate operators and magnetic locks.
Can you please provide model # and manufacturers information on these items?

Inquiry submitted 02/08/2019

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/08/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.