Inquiry #1: Key/Note 8 on Plan Sheets SC-1, SC-3, and SC-5 call out "Midwest Guardrail System" on the south/uphill shoulder. This feature isn't shown in the Layout Plans or Bid Item list. Please clarify if this is existing and should be protected or is to be installed as part of the project. If this is new installation, please provide a Bid Item for payment.
Inquiry submitted 12/06/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:The plans SC-1, SC-3, and SC-5 have been updated to read as follows: Note 8: "Exist GUARDRAIL SYSTEM". The term "MIDWEST" has been removed. This change is now consistent with the note "PROTECT IN PLACE Exist GUARDRAIL" and the callout shown on Layout Plan L-1. Refer to Addendum No. 3 dated December 19, 2022 for plan revisions.
Response posted 12/20/2022




Inquiry #2: Key/Note 8 on Plan Sheets SC-1, SC-3, and SC-5 call out "Midwest Guardrail System" on the south/uphill shoulder. This feature isn't shown in the Layout Plans or Bid Item list. Please clarify if this is existing and should be protected or is to be installed as part of the project. If this is new installation, please provide a Bid Item for payment.
Inquiry submitted 12/06/2022

Response #1:Please refer to Q#1
Response posted 12/07/2022




Inquiry #3: The typical sections on X-1 show the Barrier Slab Section 1 (T = 3'-6") width to ETW as 5'-0", with the Section extending further out to the EP for an overall width > 5'-0". This section is shown as a constant 5'-0" width in the Structure plans. Please confirm that Barrier Slab Section 1 is a constant 5'-0" width, as shown in the Structure plans.
Inquiry submitted 12/06/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:On plan sheet X-1, the width of the shoulder adjacent to the barrier on the SB direction has been revised from 2' to be 2'-2" width. This change applies to the 2 cross sections between "VEN33-PM19" Sta 999+38.00 to Sta 1003+15.00 and "VEN33-PM19" Sta 998+92.25 to Sta 1002+03.32.

In addition, the 5' width line has been extended to the Edge of Pavement (EP). This is now consistent with the cross section for the concrete barrier slab - typical section (sheet 90 of 97).

Refer to Addendum No. 3 dated December 19, 2022 for plan revisions.
Response posted 12/20/2022




Inquiry #4: Please confirm the State will allow for the installation of threaded rebar couplers ("form savers") as service splices between the Stage 1 and 2 barrier slab work without staggering as required by Section 52-6.03. This is necessary to comply with the second sentence of note 9 on Plan Sheet 90 of 97: "Reinforcing steel shall be continuous through all construction joints."
Inquiry submitted 12/06/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:Section 52-6.03A has been added to the Special Provisions to specify that splices in bar reinforcing steel at construction joints of the barrier slab do not need to be staggered.
Response posted 12/20/2022




Inquiry #5: Please confirm that the pickup truck and driver for fire control as described in Section 7-1.02M(2) of the Special Provisions must be solely dedicated to fire control and may have no other job responsibilities on the project.
Inquiry submitted 12/06/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:Per the special provisions section 7-1.02M(2), the following is stated: "Furnish a pickup truck and driver for the sole purpose of fire control during working hours." For any other responsibilities, please refer to this special provision for compliance.
Response posted 12/20/2022




Inquiry #6: Legend bullet 7 on Sheet E-4 includes a Southern California Edison Service ID of 0000-000-000.000. Please confirm this is the accurate service ID or provide the correct service ID.
Inquiry submitted 12/06/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:The ID is now provided on plan sheet E-4 as shown: Service ID: 07-52-033-R-018.985-M.
Response posted 12/20/2022




Inquiry #7: Please provide a date by which the Southern California Edison service shown on Sheet E-4 will be installed and confirm it is the State's responsibility to coordinate the installation as no other provisions are provided in the Special Provisions.
Inquiry submitted 12/06/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:It is Caltrans responsibility to coordinate with Southern California Edison (SCE) to bring power to service cabinet. The estimated time to receive power from SCE is 4 months.
Response posted 12/20/2022




Inquiry #8: Please confirm the State will allow for the installation of threaded rebar couplers ("form savers") as service splices between the Stage 1 and 2 barrier slab work without staggering as required by Section 52-6.03. This is necessary to comply with the second sentence of note 9 on Plan Sheet 90 of 97: "Reinforcing steel shall be continuous through all construction joints."
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:Please refer to Q#4.
Response posted 12/20/2022




Inquiry #9: The typical sections on X-1 show the Barrier Slab Section 1 (T = 3'-6") width to ETW as 5'-0", with the Section extending further out to the EP for an overall width > 5'-0". This section is shown as a constant 5'-0" width in the Structure plans. Please confirm that Barrier Slab Section 1 is a constant 5'-0" width, as shown in the Structure plans.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:Please refer to Q#3.
Response posted 12/20/2022




Inquiry #10: Please confirm that the pickup truck and driver for fire control as described in Section 7-1.02M(2) of the Special Provisions must be solely dedicated to fire control and may have no other job responsibilities on the project.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:Please refer to Q#5.
Response posted 12/20/2022




Inquiry #11: Legend bullet 7 on Sheet E-4 includes a Southern California Edison Service ID of 0000-000-000.000. Please confirm this is the accurate service ID or provide the correct service ID.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:Please refer to Q#6.
Response posted 12/20/2022




Inquiry #12: The last cross section provided is at Station 1002+50, are there cross sections available to the end of the barrier slab at 1003+15? Please provide.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/07/2022


Response #2:The Typical Cross Section X-1, Structure General Plans, and Stage Construction Plans are currently showing the barrier slab from Sta 1002+50 to Sta 1003+15. Refer to Addendum No. 3 dated December 19, 2022 for plan revisions.
Response posted 12/20/2022




Inquiry #13: The Stage Construction plans and lane closure charts show the roadway being re-opened to it's original configuration after each of the Stage 1 Phases 1-3. Profile sheet P-2 and the cross sections show grade differentials between OG and FG of 2" to 4" at roadway centerline for most of the length, including a 4" differential at the north end tie-in. The longitudinal construction joint between Stage 1 and Stage 2 is ~3' offset from the centerline and is on or very close to the wheel path. Transverse joint transitions between new construction and existing roadway will also be needed. Please provide details of the temporary longitudinal and transverse construction joints, modify the profiles to eliminate grade breaks that may endanger the traveling public, or modify the construction staging as necessary.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/08/2022


Response #2:Please refer to addendum No. 6, dated January 9, 2023.
Response posted 01/12/2023




Inquiry #14: The Barrier Slab has no aggregate base and/or bedding shown under it. It appears that much of the existing material at the Slab subgrade plane will be rock. Breaking and removal of rock encountered above subgrade will likely result in overexcavated areas. Please confirm that the Barrier Slab concrete can be placed directly on rock grade with no aggregate base, leveling course, and/or other bedding required.
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/08/2022


Response #2:Refer to the CONCRETE BARRIER SLAB – TYPICAL SECTION on sheet 90 of the plans. This typical section does not show any material below the concrete barrier slab, so the slab is to be placed on grade after removing material to construct the slab to the thickness shown with the top of slab at the profile shown. Please bid per the current contract bid documents.
Response posted 12/22/2022




Inquiry #15: If there are no local State-certified ready mix concrete suppliers for the several concrete bid items then has the State acquired the necessary right-of-way and required permits most likely required by the SCAQMD, local forestry/environmental, county and city jurisdictional agencies in order to allow the Contractor to produce this concrete adjacent or reasonably near the project within State right-of-way?
Inquiry submitted 12/07/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/08/2022


Response #2:Please reference Section 13-1.01C(3) of Standard Specification, Bid per Contract Documents.
Response posted 01/10/2023




Inquiry #16: Section 83-2.08 - Tubular Railings show "Paint for galvanized railing must comply with section 59-3". Please clarify if Item # 48 - Tubular Bicycle Railing should be painted, powder coated or just galvanized finish. Thank you.
Inquiry submitted 12/22/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/23/2022


Response #2:The tubular bicycle railing is to be painted after it is galvanized. Please refer to Note 5 on Sheet 88 of the plans and to section 59-3.03 in the Special Provisions. Please bid per the current contract bid documents.
Response posted 01/09/2023




Inquiry #17: Sheet Lay-out L-2 shows a Transition Railing (Type WB-31) that connects to the crash cushion however there's no pay item for this. Also, please provide construction details for this. Thank you.
Inquiry submitted 12/22/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/23/2022


Response #2:Please bid per contract documents.
Response posted 01/12/2023




Inquiry #18: Since addendum 6 has not yet been issued, will Caltrans be pushing the bid date again?
Inquiry submitted 01/06/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/06/2023


Response #2:Addendum No. 6, dated January 9, 2023, has been issued to the contract for CONSTRUCTION ON STATE HIGHWAY IN VENTURA COUNTY NEAR OJAI FROM 0.5 MILE SOUTH OF BEAR CREEK BRIDGE TO 0.1 MILE NORTH OF NORTH FORK MATILIJA CREEK BRIDGE.
Response posted 01/09/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.