Inquiry #1: This bid has 4 Qty. x CMS (Changeable Message Signs).
Under Notice to Bidders & Special Provisions, Page-95 (Actual page-104), Item 87-12.02B / 11.5.4.2 (Changeable Message Signs), pixel pitch is 20mm. 20mm pixel pitch is for Model CMS 800. Item-12 also says Changeable Message Sign Type-1, which is CMS 800 model.
But, in the Project Plans for construction drawings, under Special Design Signs, on page-SDS-1, SDS-2, SDS-3 (actual page-92, 93, 94), it says CMS 700. CMS 700 has 2.75 inch pixel pitch, which is 69.85mm pixel pitch.
So, the specs and drawing does not match and is not consistent.
Isn't this bid for CMS 800 and not CMS 700? Could you please clarify?

Inquiry submitted 10/27/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/29/2023


Response #2:Please refer to addendum No.1 issued on Nov 7, 2023.
Response posted 11/07/2023




Inquiry #2: Refer to plan sheet 135 as a typical example and situation for all applicable sheets. Per the construction notes, confirm that one existing 4" conduit contain only 2ea existing innerducts with cables and that same conduit is to be reused and replaced with new innerduct and cable as noted.
Inquiry submitted 11/01/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/02/2023


Response #2:Contractor to bid per plan. Existing spare 4” conduit to remain as-is (empty).
Response posted 11/03/2023




Inquiry #3: Are we to assume the communication will be rerouted during the rewiring of the entire cable replacement? Is there any details related to this that the bidder should be aware of or directed to?
Inquiry submitted 11/01/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/02/2023


Response #2:Cellular Router is use for temporary communication during the replacement of the innerduct and fiber cables.
Response posted 11/03/2023




Inquiry #4: The irrigation plans show existing irrigation to be removed and to R & D existing ICC "I", please issue an addendum adding Remove Irrigation Facility pay item.
Inquiry submitted 11/08/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/09/2023


Response #2:Please bid per contract documents.
Response posted 11/13/2023




Inquiry #5: Irrigation Plan Sheet IP-4 shows proposed controller wire crossing Route 91 & WB On Ramp. For installation purposes, is the contractor to utilize existing sleeves for crossing of the entire freeway? or Will Caltrans provide a line item for new sleeves?
Inquiry submitted 11/13/2023

Response #1:Please refer to Section 20-2.04C(3) Conductors in Conduits of the standards specifications.
Response posted 11/13/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.