Inquiry #1: Reference Planting Plan, there are call-out Compost and Incorporate Materials areas only. However, It does not mention how many depth for Incorporate Materials at these areas. Could you please clarify for it? Does we bid 4" depth like Incorporate Material at Erosion Control areas?
Inquiry submitted 11/27/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/28/2022


Response #2:6” Compost, incorporate materials. Please see Biofiltration swale (Typ) detail on PL-1.
Response posted 01/04/2023




Inquiry #2: SP Section 20-2.06B(2)(a) shows the controller prices and it says that these prices are good until 2/1/2023. The controllers could be installed after 2/1/2023. Please update the price.
Inquiry submitted 12/16/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/17/2022




Inquiry #3: Irrigation plans show new and additional control valves, but there are no new control wires shown from the controllers. Are there additional existing control wires available for the additional control valves or should contractor install new control wires from the controllers to the additional control valves?
Inquiry submitted 12/16/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/17/2022


Response #2:Install new wires where needed as shown on the plans.
Response posted 01/04/2023




Inquiry #4: PL-1 legend calls out Roadside Clearing to "Remove dead or dying groundcover, shrubs, and trees. All existing weeds to be removed.", but in areas such as in PP-10 where carpobrotus edulis are to be planted contains existing mulch. Is the mulch to be removed and disposed of?
Inquiry submitted 01/04/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/04/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.