Inquiry #1: Q1. Per special provision 39-2.02A(1), no HMA-A paving is allowed from 11/01 to 05/01. Please confirm that this condition doesn't affect this project since there is no HMA-A paving for this project and all paving is RHMA-G. Also all paving location is shoulder and MVP, no traveled way.
Q2. All HMA-A material in this project is for Dike only. Please verify if the HMA-A for dike should be produced using a WMA Additive Technology per 39-2.02A(1).
Q3. Per 39-2.02C, material transfer vehicle is required for HMA-A when the temperature is below 70 degree. Please advise if this applies to the material for dike as well.

Inquiry submitted 12/07/2020

Response #1:
Q1: Please bid according to Contract Documents.
Q2: Please bid according to Contract Documents.
Q3: Per39-2.02C, Quantity of HMA to be paved is greater than 1,000 tons and when the temperature is below 70 degree material transfer vehicle is required.
Response posted 12/07/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.