Submit new inquiry for this projectInquiry #1: Would you double check PPC quantities (SQFT & CF) at Location #3? What is shown isn't remotely close to the quantities shown in the table. Thanks.
Inquiry submitted 12/04/2020
Response #1:Please refer to addendum No.1 issued on 12/23/2020
Response posted 12/04/2020
Inquiry #2: Chain link Type 7 MODIFIED
The specs and plans do not explain what makes this modified?
Could you elaborate?
Inquiry submitted 12/29/2020
Response #1:Please refer to “Notes†on Page 52 of 71. Bid per the current contract documents.
Response posted 12/30/2020
Inquiry #3: According to the Railroad Information Handout for this project, it calls for the Prime Contractor to obtain a Right of Entry Agreement (REA).
- What is the cost of this Right of Entry Agreement (REA)? If there is a cost, does the Prime Contractor pay for the REA and then the State reimburses the Prime Contractor for the costs of the REA?
Inquiry submitted 01/05/2021
Response #1:Any Right of Entry costs that are required for this project are the responsibility of the contractor. This information is referenced in the supplemental handout under number 9 of the Right of Way Agreement contained in the supplemental handout.
Response posted 01/05/2021
Inquiry #4: According to the Railroad Information Handout for this project, it calls for the Prime Contractor to obtain a Right of Entry Agreement (REA).
- What are the Railroad Protective Liability Insurance (RRPLI) requirements for this project?
Inquiry submitted 01/05/2021
Response #1:Railroad Protective Liability Insurance is required by the railroad company on this project. This information is referenced in the supplemental handout under Sections A and B of No. 15 of the Right of Way Agreement contained in the supplemental handout. Contractor should consult the railroads form 6, which can be found on their website for specific insurance requirements.
Response posted 01/05/2021
Inquiry #5: Is there an estimate for the number of concrete washouts needed for this project?
Inquiry submitted 01/06/2021
Response #1:Temporary Concrete Washout is a Lump Sum item. Please check project spec, Bid Item list page #3 and Item no. 15.
Response posted 01/06/2021
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.