Viewing inquiries for 08-1F3624

Submit new inquiry for this project


Inquiry #1: I need clarification on the electrical quantities drawing EQ-1 sheet 51 of 57 it calls out quantities for sheets E-1 thru E-12. The drawing package I have only has drawings E-1 thru E-6?
Inquiry submitted 07/29/2019

Response #1:submitted for consideration
Response posted 08/01/2019


Response #2:This issue will be addressed in an addendum.
Response posted 08/02/2019


Response #3:Please refer to Addendum #2.
Response posted 08/13/2019




Inquiry #2: Please verify the quantities on sheet 51 of 57 (EQ-1) It references sheets that are not in the plans.
Inquiry submitted 07/29/2019

Response #1:submitted for consideration
Response posted 08/01/2019


Response #2:Please refer to Addendum #2
Response posted 08/13/2019




Inquiry #3: Shown on plan sheet number 48, E-4 are three structure locations i am not able to find when cross-referencing to the SQ Drawings. The locations are all on Route 215 N/B, the PM numbers are 10.812, 16.88 and 17.27. Are new reflective signs being installed at these locations ? Are the PM numbers indicated on E-5 plan sheet incorrect ? Please advise, Thanks.
Inquiry submitted 08/02/2019

Response #1:submitted for consideration
Response posted 08/02/2019


Response #2:Q: Shown on plan sheet number 48, E-4 are three structure locations i am not able to find when cross-referencing to the SQ Drawings. The locations are all on Route 215 N/B, the PM numbers are 10.812, 16.88 and 17.27. Are new reflective signs being installed at these locations ?
A: The three post miles in question have been modified and are indicated under the updated Sheet E4 and will include the reflective signs. Please refer to Addendum #2.

Q: Are the PM numbers indicated on E-5 plan sheet incorrect ? Please advise, Thanks.
A: The post mile numbers on sheet E-5 are correct. Please bid per current contract documents.

Response posted 08/13/2019




Inquiry #4: The special provisions do not include a delayed start to allow time for sign panel fabrication after award. How shall the low bidder fabricate sign panels and complete all work within 50 WDs?
Inquiry submitted 08/20/2019

Response #1:submitted for consideration
Response posted 08/20/2019


Response #2:Bid per current contract documents.
Response posted 08/20/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.