Inquiry #1: Ref. Plan Sheet 22 of 38; The note states “Deck plate to be ribbed for traction”. Please provide rib requirements / details.
Inquiry submitted 10/20/2020

Response #1:Your inquiry is being reviewed. Unless an addendum is issued addressing your concern, please bid per the current contract bid documents
Response posted 10/21/2020


Response #2:Please refer to Addendum #1.
Response posted 11/13/2020




Inquiry #2: Could Caltrans please confirm that no Natural Resource Protection Plan (NRPP) is required for this project. There is no NRPP bid item listed, however, there are two instances where it is referenced in the Special Provisions. See below:

Replace the 2nd and 3rd paragraphs of section 14-6.03D(1) with:
The Contractor-supplied biologist must implement monitoring and reporting requirements described in the natural resources protection plan.

Add after the 1st sentence of the 3rd paragraph of section 14-6.03D(2):
Allow 15 days for review.

Inquiry submitted 11/10/2020

Response #1:Your inquiry is being reviewed. Unless an addendum is issued addressing your concern, please bid per the current contract bid documents.
Response posted 11/12/2020




Inquiry #3: What size rock is to be used for the temporary construction roadway?
Std Detail T67 does not indicate size.

Inquiry submitted 11/10/2020

Response #1:Temporary Roadway will make use of the existing native material
Response posted 11/12/2020




Inquiry #4: In regards to items 30 and 31 "Temporary Desert Tortoise Fence" and "Desert Tortoise Fence" are these items separated because one is defined as temporary and the other is a permanent installation?
Inquiry submitted 11/12/2020

Response #1:Submitted for consideration
Response posted 11/13/2020


Response #2: "Temporary Desert Tortoise Fence" (TDTF) is to be installed as shown on plans with input from the Engineer and the Biologist before construction begins.

"Desert Tortoise Fence" (DTF) is to be installed as directed by the Engineer and Biologist after the end of construction along adjacent R/W fence. Desert Tortoise Fence consists of repurposed TDTF and additional new DTF.

Response posted 11/16/2020




Inquiry #5: In regards to the temporary construction entrance will rumble plates be used or native material? If so will the plates be type I or type II construction entrances?
Inquiry submitted 11/13/2020

Response #1:Submitted for consideration
Response posted 11/13/2020


Response #2:Q. In regards to the temporary construction entrance will rumble plates be used or native material?

A. Rumble plates will be used

Q. If so will the plates be type I or type II construction entrances?

A. Use Type I entrance. Material will be as described in the 2018 Standard Specifications under Section 13-7.03B Materials.

Response posted 11/16/2020




Inquiry #6: Could you provide attachment documents associated with CDFW ITP No. 2081-2019-038-06, as only the permit itself was included in the IH?
Inquiry submitted 11/16/2020

Response #1:Please bid per current contract documents.
Response posted 11/16/2020




Inquiry #7: Per Project Special Provisions, Section 14-6.03D(1) states the following regarding pre-construction survey reports to be submitted by the CSB: "Survey the job site for regulated species and submit a preconstruction survey report within 24 days before starting work."
As the CSB is required to complete Desert Tortoise and rare plant surveys no more than 7-days prior to the start of ground-breaking activities, is it acceptable to submit the pre-construction survey report immediately following completion of these surveys (i.e. within 1 week of starting ground-breaking activities)?

Inquiry submitted 11/16/2020

Response #1:Please bid per current contract documents
Response posted 11/16/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.