Inquiry #1: Sheet E-1 & E-2 shows a 24"x18" welded steel pipeliner (arched) as a protection for conduits. I am assuming the intention is for the steel pipeliner to be installed under the freeway by trenchless technology methods and not open trench? Why is a standard circular steel casing pipe not specified, to be installed by auger bore methods? What is the depth of the 24"x18" welded steel pipe under the freeway? Is geotechnical information availble for the soils to be excavated through?

Regards,
Evan Wheeler
Pipe Jacking Trenchless

Inquiry submitted 05/07/2019

Response #1:submitted for consideration
Response posted 05/08/2019


Response #2:An addendum will be issued soon to address this matter.
Response posted 05/10/2019




Inquiry #2: will soils report be made available in order to determine the condition for the underground pipe liner installation?
where does the 18" X 24" pipe liner start and stop and at what depth?
what type of transition do you want from pipe liner to conduit: vault, pull-box or direct burial?

Inquiry submitted 05/08/2019

Response #1: submitted for consideration
Response posted 05/08/2019


Response #2: submitted for consideration
Response posted 05/08/2019


Response #3:Q: will soils report be made available in order to determine the condition for the underground pipe liner installation?
A: A soil report is not required for this project.

Q: where does the 18" X 24" pipe liner start and stop and at what depth?
A: The plans indicate existing pipe liners, however, no new pipe liner will be installed on this project.

Q: what type of transition do you want from pipe liner to conduit: vault, pull-box or direct burial?
A: SCE work drawings will show location of pull boxes required for conduit to be installed across I-15 mainline. RE will have those drawings at time of construction


Response posted 06/25/2019




Inquiry #3: Please confirm the nearest Caltrans approved asphalt plant to supply asphalt for this project.
Inquiry submitted 05/09/2019

Response #1:submitted for consideration
Response posted 05/09/2019


Response #2:The information requested is unavailable. Please bid per current contract documents.
Response posted 06/25/2019




Inquiry #4: Is there any pre-approved manufacturer or vendor for the vehicle charges? Did Caltrans use a particular manufacturer to develop the specification for that material? Any previously approved vendor/manufacturer that we can use? Please advise.
Inquiry submitted 05/14/2019

Response #1:submitted for consideration
Response posted 05/14/2019


Response #2:Q: Is there any pre-approved manufacturer or vendor for the vehicle charges?
A: No there isn't.

Q: Did Caltrans use a particular manufacturer to develop the specification for that material?
A: Caltrans extracted its data from a variety of manufacturers.

Q:Any previously approved vendor/manufacturer that we can use? Please advise.
A: Please bid per current contract documents

Response posted 06/25/2019




Inquiry #5: Are the ELECTRIC VEHICLE CHARGING STATION SYSTEM(s) supplied by CALTRANS or project owner? Is bid item#36 meant ONLY for installation? Please confirm and provide EVCS provider and manufacture.

Inquiry submitted 06/24/2019

Response #1:submitted for consideration
Response posted 06/24/2019


Response #2:Q: Are the ELECTRIC VEHICLE CHARGING STATION SYSTEM(s) supplied by CALTRANS or project owner?
A: Electric Vehicle Charging Station Systems are contractor furnished.

Q: Is bid item#36 meant ONLY for installation?
A: Item 36 "Electric Vehicle Charging Station System" includes chargers, material and labor.

Q: Please confirm and provide EVCS provider and manufacture.
A: The State does not provide information regarding EVCS providers and manufacture.


Response posted 06/25/2019




Inquiry #6: Please clarify the followings:
1- Confirm the total number of EVSE is 8 charging stations. Are they level 1 or level 2 DC EV stations?
2- How many number of vehicle can be charged simultaneously for each EV charging station (EVSE)?

Inquiry submitted 07/03/2019

Response #1:submitted for consideration
Response posted 07/03/2019


Response #2:Q: Confirm the total number of EVSE is 8 charging stations.
A: There are a total of 4 charging stations, however, each charger has dual charging connectors

Q: Are they level 1 or level 2 DC EV stations?
A: All chargers must be level 3

Q: How many number of vehicle can be charged simultaneously for each EV charging station (EVSE)?
A: Each dual capacity charger cannot accommodate simultaneous charging

Response posted 07/08/2019




Inquiry #7: Refer to the response on Inquiry #1. The has not been an addendum to address this concern.
Inquiry submitted 07/09/2019

Response #1:submitted for consideration
Response posted 07/10/2019


Response #2:Please bid per current contract documents.
Response posted 07/10/2019




Inquiry #8: Refer to Inquiry #2 response on pipeliner. If there is no pipeliner to install, should there still be a bid for item 20 to bid? The responses on inquiry #1 and #2 are confusing.
Inquiry submitted 07/10/2019

Response #1:There should be no bid for Item 20.
Response posted 07/10/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.