Viewing inquiries for 08-1H9004

Submit new inquiry for this project


Inquiry #1: In regards to the "Pavement Quantities" Table and Bid Items 14 and 16, the third line calls for 41 LNMI of Crack Treatment and 54 CY of Replace AC Surfacing from PM 142.28 to PM 142.28 on Route 62. Is this correct?
Inquiry submitted 04/03/2020

Response #1:Submitted for consideration
Response posted 04/06/2020


Response #2:This issue will be addressed via addendum.
Response posted 04/07/2020


Response #3:Please refer to Addendum #1.
Response posted 04/09/2020




Inquiry #2: Bid item 15 Aggregate (Seal Coat), Section 37-2.04 B(6)
"Aggregate for asphalt rubber chip seal must comply with the 3/8" gradation". This size chip is inadequate, to small, for use on Rte 62 and Rte 95. The appropriate size is the 1/2"chip per Section 37-2.04 B (6), 0-30 passing the 3/8" sieve.

Inquiry submitted 04/06/2020

Response #1:This issue will be addressed via addendum.
Response posted 04/07/2020


Response #2:Please refer to Addendum #1.
Response posted 04/09/2020




Inquiry #3: Species Protection Area 2 is defined as:
Desert Tortoise Critical Habitat (SR-62, PM 117-132.7).

Protection Measures for Species Protection Area 2 require:
Immediately prior to the start of ground disturbing activities, and prior to the installation of any desert
tortoise exclusion fencing, clearance surveys for the desert tortoise will be conducted by the contract
supplies biologist. The entire project area and staging areas will be surveyed for desert tortoise and
their burrows by the contract supplied biologist prior to the start of any ground disturbing activities.

Construction Plans indicate that there is no work on SR-62 between 122.5 and 141.8. Are desert tortoise surveys required along SR-62 between 122.5 and 132.7?

Inquiry submitted 04/07/2020

Response #1:Submitted for consideration
Response posted 04/07/2020


Response #2:This issue will be addressed via addendum.
Response posted 04/07/2020


Response #3:Please refer to Addendum #1.
Response posted 04/09/2020




Inquiry #4: Information Handout, specifically, railroad requirements.
Please clarify: What are the requirements and responsibilities of the contractor, i.e right of entry permit, insurance requirement, flagging cost?

Inquiry submitted 04/07/2020

Response #1:submitted for consideration
Response posted 04/07/2020


Response #2:Please refer to the special provisions section 2-1.06B, and the Information Handout for the Arizona and California Railroad Company Permits.
Response posted 04/07/2020




Inquiry #5: 14 Environmental Stewardship:

Can you provide the NES for this project?

Inquiry submitted 04/09/2020

Response #1:The NES document will not be provided. Please refer to Section 14 (Environmental Stewardship) of the Special Provisions for all environmental requirements.
Response posted 04/10/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.