Inquiry #1: We are interested to bid this project.
Is there a job walk planned for this project? If not can a prospect contractor visit the job site?
Thank you

Inquiry submitted 08/25/2022

Response #1:There is no pre bid jobsite visit scheduled for this project. If you would like to visit the jobsite prior to bid, please contact Brian Patz at 760-937-3680 to schedule a visit. No walk-ins will be allowed.
Response posted 08/26/2022




Inquiry #2: Is there a job walk scheduled for this project?
Inquiry submitted 08/26/2022

Response #1:There is no pre bid jobsite visit scheduled for this project. If you would like to visit the jobsite prior to bid, please contact Brian Patz at 760-937-3680 to schedule a visit. No walk-ins will be allowed.
Response posted 08/26/2022




Inquiry #3: Regarding the DVBE requirements - 5%
If you are one of the low 3 are there additional forms that need to be sent in after the bid opening? If so what are they and where do we access.

Inquiry submitted 09/06/2022

Response #1:The forms are included in the bid book. The certified DVBE Summary Form also can be found on the Caltrans Contractor’s Corner, Electronic Bidding section of Caltrans website: http://ppmoe.dot.ca.gov/des/oe/electronic-bidding.html.
Response posted 09/06/2022




Inquiry #4: Reference drawing A1-100; Whereon is states, "Remove tile and VCT finish flooring in its entirety".
Q - What are the sq/ft of each?

Inquiry submitted 09/12/2022

Response #1:The inquiry has been received and circulated for review
Response posted 09/14/2022


Response #2:An addendum is being issued to address the inquiry.
Response posted 09/22/2022




Inquiry #5: Please verify CMU thickness.
Reference drawing A1-00, whereon it states, "Remove counter and teller window assembly".
Q - is the overhead coiling door / security screen part of the demo and if so, does the Contract keep the unit?

Inquiry submitted 09/12/2022

Response #1:The inquiry has been received and circulated for review
Response posted 09/14/2022


Response #2:Please see the label on A1-00 “Remove counter and teller window assembly”. The removal refers to the entire counter and all parts of the teller window assembly, including the overhead coiling door/security screen.
These items are to be removed from this site. Please bid per the current contract documents.

Response posted 09/14/2022




Inquiry #6: See drawing A0-05; door schedule shows the OH door 16' wide x 7' high // drawing A1-03 shows it at 18' wide x 9' high
Q - Please clarify.

Inquiry submitted 09/12/2022

Response #1:The inquiry has been received and circulated for review
Response posted 09/14/2022


Response #2:An addendum is being issued to address the inquiry.
Response posted 09/22/2022




Inquiry #7: Q - Who is responsible for moving all the furniture and items in the rooms?
Inquiry submitted 09/14/2022

Response #1:The inquiry has been received and circulated for review
Response posted 09/14/2022


Response #2:The furniture and items in the rooms will be moved by other.
Response posted 09/16/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.