Inquiry #1: On sheet L-1 a drain is shown under the road entry Northwest of Pond 1 and refers to Note 3. Note 3 directs bidders to the Sanitary Plans for details. Sheet SS-3 does not show this drain nor swales 1 and 2. SS-3 shows swale 3 only. Sheet L-1 does not show swale 3. Please provide clarification.
Inquiry submitted 11/12/2019

Response #1:Your inquiry has been submitted for review
Response posted 11/13/2019


Response #2:Refer to sheets SS-23 and SS-24 for drain pipes and SS-25 for swale 3. Refer to sheets X-1 and L-1 for swales 1 and 2.
Response posted 11/14/2019




Inquiry #2: Why does the aerator motor needs to be explosionproof? What group class (e.g., ABCD)
Inquiry submitted 11/14/2019

Response #1:Submitted for consideration.
Response posted 11/14/2019


Response #2:Please refer to Addendum No. 1 dated November 22, 2019.
Response posted 11/25/2019




Inquiry #3: Based on the drawings its seems that the Well Pump Panel will only need to be modified/added too? If yes, will the modifications/additions need to happen on site or will this panel be supplied to party that is awarded this job?

Secondly, please provided clarification on what will need to be added to the Well Pump panel. Several items, as shown on the drawings seem to be field devices that the panel will be controlling however they will not be physically located in the Well Pump panel. (1) FIU--8, (2) ATS Cabinet, (3) Generator?

Then items such as (1) 20A/1P breakers, (2) Soft Starter, (3) HOA for FIU-8, will all be located inside the Well Pump Panel?


Inquiry submitted 11/19/2019

Response #1:Submitted for consideration.
Response posted 11/19/2019


Response #2:Modifications/additions to existing well pump control panel must be performed on site.

Refer to plan sheet numbers 93 and 94 (EE4-2 and EE4-3) which clearly show new equipment/devices and their locations.

Yes, items such as (1) 20A/1P breakers, (2) Soft Starter, (3) HOA for FIU-8, will all be located inside the Well Pump Panel.
Response posted 11/21/2019




Inquiry #4: Section 330523.13, part 3, 3.4 "tolerances" item "B" states that the maximum variation from vertical is (2"). This is not realistic due to electronic tolerances and any unforeseen sub-surface obstruction or conditions that may be encountered. We are requesting that the vertical tolerance be adjusted to (12"). Please advise.
Inquiry submitted 11/21/2019

Response #1:Submitted for consideration.
Response posted 11/21/2019


Response #2:For variation from vertical elevation, please refer to horizontal directional drilling notes in detail 1 on sheet SS-14 which require a minimum of 5 feet between HDPE casing and bottom of structural section of freeway.
Response posted 11/26/2019




Inquiry #5: EEO-2, EEO-5, EEO-18 should indicate lengths of electrical trenching requirements but there are no lengths, how do we figure the lengths?
Inquiry submitted 11/21/2019

Response #1:Submitted for consideration.
Response posted 11/21/2019


Response #2:Please refer to section 99-16010A(2) System Description of the Special Provisions. Please bid per the current contract documents.
Response posted 11/25/2019




Inquiry #6: We are requesting a one week extension to the bid date due to the holiday, several of our vendors are on vacation and we are unable to get quotes on key portions of the project.
Inquiry submitted 11/27/2019

Response #1:Your inquiry has been submitted for review.
Response posted 11/27/2019


Response #2:Refer to Addendum No. 2, dated December 2, 2019.
Response posted 12/02/2019




Inquiry #7: Regarding Spec 99-16420, pg 103, states that the "automatic transfer switch for the north bound and south bound rest areas must be fixed mount power molded case switch..." Would the State accept a standard ATS like an ASCO 7000 or 300 series or Generac Service Entrance Breaker switch with the same 65KAIC rating?
Inquiry submitted 12/03/2019

Response #1:Submit product data for review and approval after the Contract is awarded. Please bid per the current contract documents.
Response posted 12/04/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.