Inquiry #1: Is Temporary Concrete Barrier Rail going to be required if the contractor can remove the guardrail, grade for vegetation control & re-install the guardrail in the same shift?
Inquiry submitted 10/10/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/10/2022


Response #2:You are advised to look at the Traffic Handling Plan sheets “TH-1” to “TH-23”, Traffic Handling Details sheet “THD-1” and Traffic Handling Quantities sheet “THQ-1” for placement of Temp Barrier System. If not shown on those plan sheets then it was determined that the work could be completed within one work shift under one-way reversing traffic control. Please refer to Special Provisions Section 12 for the appropriate Lane Closure Charts. Please place your bid in accordance with the current contract documents.
Response posted 10/18/2022




Inquiry #2: Will Caltrans allow for other types of temporary barrier rail other than concrete?
Inquiry submitted 10/10/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/10/2022


Response #2:Please refer to Revise Standard Specification Section 12-3.20. Please place your bid in accordance with the current contract documents.
Response posted 10/18/2022




Inquiry #3: Section 12-4.02C(7)(b) states that Not more than 1 Stationary closure is allowed in each direction of travel at one time.

With this project spread over such a great distance why can't it be allowed to have at least 2 closures in each direction at a time with a minimum of 5 miles or more between closures?

Inquiry submitted 10/13/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/13/2022


Response #2:Attention is directed to Addendum #02 dated 10/21/2022.
Response posted 10/26/2022




Inquiry #4: Regarding Item #12 Temporary Barrier. The only locations that item should be used is at the bridge ends to protect those work areas during the course of the transition wall construction. On standard guardrail runs there is not enough shoulder width to allow equipment behind the barrier to have room to work. For example, assuming a shoulder width of 8' and setting the temporary barrier 2' inside the fog line as the traffic handling details show and subtracting another 2' for the width of the barrier there would only be a 4' wide work area. That is the best-case scenario, some areas on the project only have 4' to 6' wide shoulders. The only way this would work is to move the barrier out to centerline at the beginning of each shift and back to the shoulder at the end of shift. Is it Cal Trans intent to require the contractor to perform the work this way? If so, the cost will go up exponentially due to the decrease in production and the additional resources required to accomplish this operation.
Inquiry submitted 10/19/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/19/2022


Response #2:Temporary Barrier System, as shown on Traffic Handling Plan sheets TH-1 to TH-23, Traffic Handling Details sheet THD-1 and Traffic Handling Quantities sheet THQ-1, has been indicated for construction work that could not be completed within one work shift under one-way reversing traffic control. If the contractor can remove the existing guardrail, grade for vegetation control & re-install the new guardrail in the same shift, then Temporary Barrier System is not required. When the existing guardrail is removed, the embankment slope or fixed object requires temporary shielding until new guardrail installation is complete. Construction access alongside the temporary barrier can be achieved using one-way reversing traffic control.
Bidder is referred to Special Provisions Section 12 for the appropriate Lane Closure Charts.

Response posted 10/26/2022




Inquiry #5: Regarding item#28 "Prune Existing Plants" This is a lump sum item with no details or quantities provided in the special provisions or the plans. Please provide details so our sub-contractors can provide quotes.
Inquiry submitted 10/19/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/19/2022


Response #2:The Lump Sum Item 28 (BEES Item Code 200052) “Prune Existing Plants” relates to the work shown on Construction Details sheet C-39, for Location 23 (Tuo-49, PM 17.60). Refer to Note 2 “Existing Blackberry shrubs to be pruned up to back edge of vegetation control”. This work is called out on the plan and section view. Please bid as per current contract documents.
Response posted 10/26/2022




Inquiry #6: Would the district consider a bid extension for this project?
Inquiry submitted 10/21/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/21/2022


Response #2:Bid extension is not under consideration at this time.
Response posted 10/23/2022




Inquiry #7: We would like to request a bid extension to allow additional time to locate interested DBE sub-contractors.
Inquiry submitted 10/24/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/24/2022


Response #2:We are not considering the bid extension at this time.
Response posted 10/26/2022




Inquiry #8: Will the SFT-M end anchors be required to be stained? They are not shown on the quantity sheets in the staining columns.
Inquiry submitted 10/25/2022

Response #1:Your inquiry has been submitted for review. Due to the scope of your inquiry and the timing of your bidder inquiry a response to your question may not be available before bid opening. If no response is given, please place your bid in accordance with the current bid documents. Attention is directed to section 1-1.01, "GENERAL" of the Standard Specifications. "After Contract approval, submit documents and direct questions to the Engineer. Orders, authorizations, and requests to the Contractor are by the Engineer."
Response posted 10/26/2022


Response #2:Please place your bid in accordance with the current contract documents.
Response posted 10/27/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.