Inquiry #1: Railroad Right Of Way Agreement Special Provision attachment dated 11/14/17 states:
1) Railroad will provide 60-days of Railroad flagging for the project.
2) State agrees to reimburse the Railroad for actual costs and expenses incurred by the RR in connection with this work.
3) Exhibit "A" cost estimate specifies work description and rate.
as such; who is responsible for the actual RR flagging costs

Inquiry submitted 09/24/2019

Response #1:Submitted for consideration.
Response posted 09/24/2019


Response #2:Attention is directed to the Information Handout and section 5-1.20C, “Rail Road Relations” of the Standard Specifications in the Contract Documents. The State will reimburse the Railroad for flagging expenses.
Response posted 10/02/2019




Inquiry #2: Is the Contractor allowed to stage construction inside existing Chain Link Fence area between Union St and Bent 33?
Inquiry submitted 09/25/2019

Response #1:Submitted for consideration.
Response posted 09/29/2019


Response #2:There are no state owned properties available for storing materials outside the work area specified in the contract. Attention is directed to section 5-1.32, "Areas for Use" of the Standard Specifications.
Response posted 10/04/2019




Inquiry #3: Bat Exclusion - 14-6.06C(1) Location's at Hinge 8, 19, 29 and 32 however the drawing sht 24 of 33 do not seem to clearly depict hinge numbers 1-36. as such please show/clarify locations of the bat exclusion devices. If they are to be installed at the new joint seal locations Hinge 7 (Not 8) Hinge 28 (Not 29)
Inquiry submitted 09/25/2019

Response #1:Submitted for consideration.
Response posted 09/29/2019


Response #2:The number of locations(4) that require Bat exclusions will not change. Please bid to include bat exclusions at four locations.
Response posted 10/08/2019




Inquiry #4: Bid Item Clean Expansion Joint - Is the estimated quantity correct since cleaning will also be required at Hinge 33 between/beyond deck repair areas?
Inquiry submitted 09/25/2019

Response #1:Submitted for consideration.
Response posted 09/29/2019


Response #2:Attention is directed to Addendum No. 1.
Response posted 10/03/2019




Inquiry #5: Hinge Detail No. 2
While it appears bridge removal (existing hinge demolition) can be performed without issue, New hinge construction might no be constructible without having Soffit access opening to complete the new concrete construction as such; are there existing soffit access openings on the repair side of the hinges?

Inquiry submitted 09/27/2019

Response #1:Submitted for consideration.
Response posted 09/29/2019


Response #2:Attention is directed to Addendum No. 1.
Response posted 10/03/2019




Inquiry #6: We've noticed on this project that the project name/description appears to be incorrect “CONSTRUCTION ON STATE HIGHWAY IN SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF MADISION STREET TO 0.2 MILE WEST OF AIRPORTWAY UNDERCROSSING”. This is how it’s listed in the Notice to Bidders and on Bidx, but since these bids bonds require the exact project description as such can you verify if it should actually be MADISON instead of MADISION. Please advise ASAP
Inquiry submitted 09/30/2019

Response #1:Your inquiry has been submitted for review
Response posted 10/02/2019


Response #2:Attention is directed to Addendum No. 1.
Response posted 10/03/2019




Inquiry #7: Does the railway adjacent to the track carry only freight, or is it a dual use track carrying both freight and passengers?

Does the state have a reliable estimate as to the number of trains per day and the length of each train that pass through the work zone?




Inquiry submitted 10/01/2019

Response #1:Your inquiry has been submitted for review
Response posted 10/02/2019


Response #2:Attention is directed to the Supplemental Project Information - Right of Way Agreement; Railroad Coordination and Section 2-1.07, "Job Site Document Examination" of the Standard Specifications. Bidder shall contact the Railroad to ascertain this information.
Response posted 10/03/2019




Inquiry #8: The information handout includes only a portion of the Asbesos survey report. Please provide the full report that includes the sampling locations, figures referenced in the report, and reference photos.
Inquiry submitted 10/01/2019

Response #1:Your inquiry has been submitted for review
Response posted 10/02/2019


Response #2:Reference is directed to section 14-11.16C of the Special Provisions. Bid in accordance with the current contract documents.
Response posted 10/02/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.