Viewing inquiries for 10-1C8704

Submit new inquiry for this project


Inquiry #1: Per pages 23 and 24 of the specs, there are steps to be taken for bird exclusion work. There is a bid item for bat exclusion, but no item for bird exclusion. How will bird exclusion work be paid for? Please advise.
Inquiry submitted 08/23/2018

Response #1:Submitted for consideration.
Response posted 08/24/2018


Response #2:Per the Special Provisions under clauses added to 2015 Standard Specifications 14-6.03A (page number 23 sand 24), bird protection is identified to be installed or ordered by Caltrans. Per 2015 Standard Specification 14-6.03B the same language is stated but in addition it is stated that the work for BIRD PROTECTION are change order work. This project added BAT PROTECTION as a pay item because the item is not covered under the standard specifications for information and payment (not change order work.
Response posted 08/26/2018




Inquiry #2: Per bid item "Remove, Transport, and Dispose Asbestos Contaminated Material", the spec reads that the Contractor will be removing and disposing of approximately 150 SQFT of Asbestos Rail Shims at 3 Locations. However, there is no item or specification for replacement of the rail shims. Please advise if there is replacement work associated within this item.
Inquiry submitted 08/23/2018

Response #1:Submitted for consideration.
Response posted 08/24/2018


Response #2:The Supplemental Project Information - Information Handout Asbestos and Lead-Containing Paint Survey Report and Special Provisions specification in section 14-11.16 indicates asbestos potential being identified in the shims of the bridge railing, there is no design work that is anticipated to disturb the railing and shims by the contract work. However, since there is known asbestos in the project limits an Asbestos Compliance Plan shall be prepared and the pay items (140003-Item #11 and 035883-Item #13) are applicable and part of the contract. Please bid accordingly.
Response posted 08/29/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.