Inquiry #1: Please review the cross sections for locations 8,9,and 10. It seems your material/operations are inverted.

Thanks

Inquiry submitted 07/16/2018

Response #1:Submitted for consideration.
Response posted 07/17/2018


Response #2:The cross sections involving cold plane existing pavement operation, placing RHMA material, and then placing HFST material [Plan Sheets C-10 (page 12 of 48) for Location #8, C-11 (page 13 of 48) for Location #9 and C-12 (page 14 of 48) for Location #10) was shown incorrectly and should be cold plane operation first, then place RHMA material and HFST material on the top as the final pavement material to be placed or constructed. This is a clarification of the incorrect order of the callouts on the referenced plan sheets.
Response posted 07/19/2018




Inquiry #2: On the Summary of Quantities page (Q-1) page 26 of the plans, it reads that at Location 4 the quantity for EB is 4,282.9 SQYD and for WB is 8,387.3 SQYD. However, on Construction Detail (C-5) page 7 of the plans, it seems to show the reverse. Please advise.
Inquiry submitted 07/17/2018

Response #1:Submitted for consideration.
Response posted 07/18/2018


Response #2:Refer to Section 2-1.09, "bid item list," of the 2015 Standard Specifications: "Submit a bid based on the bid item quantities the Department shows in the bid item list.
Response posted 07/23/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.