Inquiry #1: Can Caltrans please provide PPF files so that a proper smoothness analysis can be done prior to bidding?
Inquiry submitted 02/28/2019

Response #1:Submitted for consideration.
Response posted 02/28/2019


Response #2:Refer to Addendum No. 2, dated March 5, 2019.
Response posted 03/05/2019




Inquiry #2: On plan sheet 18, Public Road Intersection Conform Tapers table shows 21 separate locations that are to be cold planed and paved with RHMA-G. As this work will not be able to be done with Mainline RHMA-G operations and additional Rubber plant days will be required for a minimal tonnage (315 Tn); will the state please consider changing the RHMA-G in these locations to HMA Type A, as it will decrease the cost of construction for this project?
Inquiry submitted 03/04/2019

Response #1:Submitted for consideration.
Response posted 03/04/2019


Response #2:No changes will be considerated at this time. Please bid per current contract documents.
Response posted 03/05/2019




Inquiry #3: Per Section 37-3 - Agency is suppose to make a selection on if the contractor is to use truck mounted mixing trucks or continuous mixing machines. Please specify which will be required.
Inquiry submitted 03/07/2019

Response #1:The 2018 Standard Specification under 37-3.01C(3)(a) states in the last sentence "Choose a truck mounted mixer-spreader or continuous self-loading mixer spreader." This language was agreed upon by industry and Caltrans in the Rock Products Committee now called the Pavement Materials Partnering Committee, to mean the contractor chooses the type of mixer spreader they use depending on the conditions and length of the pavement project, whether is was a straight alignment or on and off ramps based on their expertise and equipment they are use.
Response posted 03/11/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.